Challenges in Implementation of 7D-BIM for Infrastructure Asset Management: A Systematic Review

被引:0
作者
Sood, Rhijul [1 ]
Laishram, Boeing [1 ]
机构
[1] IIT Guwahati, Dept Civil Engn, Gauhati 781039, Assam, India
来源
CONSTRUCTION ECONOMICS AND BUILDING | 2024年 / 24卷 / 03期
关键词
BIM; Critical Challenges; InfraAM; FM; SLR; Success Factors; INFORMATION MODELING BIM; CRITICAL SUCCESS FACTORS; FACILITY MANAGEMENT; INTEGRATION; KNOWLEDGE; ADOPTION; CONSTRUCTION; OPERATIONS; BENEFITS; DESIGN;
D O I
10.5130/AJCEB.v24i3.8738
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Infrastructure Asset Management (InfraAM)/Facilities Management (FM) which deals with infrastructure maintenance, repair, and rehabilitation needs an urgent focus on technology-based solutions. This can be done by implementing digital technologies, like Building Information Modelling (BIM), that can help in 3D visualization, 4D scheduling, 5D costing, 6D sustainability, and 7D FM throughout the service life of the project. However, BIM's implementation undergoes various challenges and to understand the critical challenges, a systematic literature review (SLR) was conducted using 89 peer-reviewed papers from three databases, and quantitative and qualitative analyses were performed. The literature revealed the critical challenges (CCs) and success factors (SFs) that influence BIM implementation for FM but lacks an interrelationship between them. Hence, the current study linked various CCs and SFs through a theoretical approach. The study found that the role of government and contractual frameworks can help to eliminate the majority of the challenges. This novel approach could provide significant contributions by helping practitioners and policymakers understand the connections between CCs and the role of SFs as potential solutions for enhancing BIM implementation for FM.
引用
收藏
页码:95 / 117
页数:23
相关论文
共 121 条
[51]   Understanding and facilitating BIM adoption in the AEC industry [J].
Gu, Ning ;
London, Kerry .
AUTOMATION IN CONSTRUCTION, 2010, 19 (08) :988-999
[52]   Integration of municipal infrastructure asset management processes: Challenges and solutions [J].
Halfawy, Mahmoud R. .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2008, 22 (03) :216-229
[53]   Exploring Key Elements and Performance of BIM and VR Technologies in the Project Management of Assembled Buildings [J].
He, Zhi-hong ;
Liu, Tao .
ADVANCES IN MULTIMEDIA, 2022, 2022
[54]   Design and development of BIM models to support operations and maintenance [J].
Heaton, James ;
Parlikad, Ajith Kumar ;
Schooling, Jennifer .
COMPUTERS IN INDUSTRY, 2019, 111 :172-186
[55]   Purchasing strategy development: A multi-level review [J].
Hesping, Frank Henrik ;
Schiele, Holger .
JOURNAL OF PURCHASING AND SUPPLY MANAGEMENT, 2015, 21 (02) :138-150
[56]   A hybrid conceptual model for BIM in FM [J].
Hilal, Mustafa ;
Maqsood, Tayyab ;
Abdekhodaee, Amir .
CONSTRUCTION INNOVATION-ENGLAND, 2019, 19 (04) :531-549
[57]   Research on the phenomenon of supply chain resilience A systematic review and paths for further investigation [J].
Hohenstein, Nils-Ole ;
Feisel, Edda ;
Hartmann, Evi ;
Giunipero, Larry .
INTERNATIONAL JOURNAL OF PHYSICAL DISTRIBUTION & LOGISTICS MANAGEMENT, 2015, 45 (1-2) :90-117
[58]   An investigation on policy direction and drivers for sustainable facilities management practice in Nigeria [J].
Ikediashi, Dubem I. ;
Ogunlana, Stephen O. ;
Ujene, Anthony O. .
JOURNAL OF FACILITIES MANAGEMENT, 2014, 12 (03) :303-+
[59]   Barriers to BIM for facilities management adoption in Nigeria: a multivariate analysis [J].
Ikediashi, Dubem Isaac ;
Ansa, Otoabasi Asuquo ;
Ujene, Anthony Okwogume ;
Akoh, Sani Reuben .
INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2025, 43 (03) :391-413
[60]  
IPWEA, 2015, International Infrastructure Management Manual (IIMM)