Solving multi-objective parallel machine scheduling problem by a modified NSGA-II

被引:62
作者
Bandyopadhyay, Susmita [1 ]
Bhattacharya, Ranjan [1 ]
机构
[1] Jadavpur Univ, Dept Prod Engn, Kolkata 700032, W Bengal, India
关键词
Job sequencing; Multi-Objective Evolutionary Algorithm (MOEA); NSGA-II (Non-dominated Sorting Genetic Algorithm-II); SPEA2; DEPENDENT PROCESSING TIMES; GENETIC ALGORITHM; SETUP TIMES;
D O I
10.1016/j.apm.2013.01.050
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we modify a Multi-Objective Evolutionary Algorithm, known as Nondominated sorting Genetic Algorithm-II (NSGA-II) for a parallel machine scheduling problem with three objectives. The objectives are - (1) minimization of total cost due tardiness, (2) minimization of the deterioration cost and (3) minimization of makespan. The formulated problem has been solved by three Multi-Objective Evolutionary Algorithms which are: (1) the original NSGA-II (Non-dominated Sorting Genetic Algorithm-II), (2) SPEA2 (Strength Pareto Evolutionary Algorithm-2) and (3) a modified version of NSGA-II as proposed in this paper. A new mutation algorithm has also been proposed depending on the type of problem and embedded in the modified NSGA-II. The results of the three algorithms have been compared and conclusions have been drawn. The modified NSGA-II is observed to perform better than the original NSGA-II. Besides, the proposed mutation algorithm also works effectively, as evident from the experimental results. (C) 2013 Elsevier Inc. All rights reserved.
引用
收藏
页码:6718 / 6729
页数:12
相关论文
共 31 条
[1]  
Agnetis Alessandro, 2012, EUR J OPER RES, V221, P296
[2]  
Amaral Armentano Virficius, 2007, EUR J OPER RES, V183, P100
[3]   The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine [J].
Behnamian, J. ;
Ghomi, S. M. T. Fatemi .
INFORMATION SCIENCES, 2013, 219 :181-196
[4]   Hybrid flowshop scheduling with machine and resource-dependent processing times [J].
Behnamian, J. ;
Ghomi, S. M. T. Fatemi .
APPLIED MATHEMATICAL MODELLING, 2011, 35 (03) :1107-1123
[5]   Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm [J].
Behnamian, J. ;
Zandieh, M. ;
Ghomi, S. M. T. Fatemi .
EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (06) :9637-9644
[6]   Bi-Objective Ant Colony Optimization approach to optimize production and maintenance scheduling [J].
Berrichi, A. ;
Yalaoui, F. ;
Amodeo, L. ;
Mezghiche, M. .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (09) :1584-1596
[7]   A fast and elitist multiobjective genetic algorithm: NSGA-II [J].
Deb, K ;
Pratap, A ;
Agarwal, S ;
Meyarivan, T .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (02) :182-197
[8]  
Dvir Shabtay, 2006, EUR J OPER RES, V173, P92
[9]  
Enrique Gerstl, 2012, INFORM PROCESS LETT, V112, P743
[10]  
Eugeniusz Nowicki, 1995, DISCRETE APPL MATH, V63, P237