DEVELOPMENT OF A MATURITY MODEL FOR THE DIGITAL TRANSFORMATION OF COMPANIES IN THE CONTEXT OF CONSTRUCTION INDUSTRY 4.0

被引:1
作者
Jaekel, Jan-Iwo [1 ]
Fischerkeller, Franziska [1 ]
Oberhoff, Tessa [1 ]
Klemt-Albert, Katharina [1 ]
机构
[1] Rhein Westfal TH Aachen, Inst Construct Management Digital Engn & Robot Con, Aachen, Germany
来源
JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION | 2024年 / 29卷
关键词
maturity model; digital transformation; construction industry; Construction; 4.0; Industry; digitalization und automation; construction companies; strategy; MANAGEMENT; BENCHMARKING; READINESS;
D O I
10.36680/j.itcon.2024.034
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction industry is characterized by a low level of productivity and digitalization, as well as the critical perceived instability of costs, deadlines and quality. One way to address these challenges is to increase the use of digital methods and technologies in the future. Optimal use of these can help to improve the quality of planning and execution and optimize the operation of existing buildings. The challenge is the implementation and integration of these methods and technologies into existing company structures. In many cases, companies do not have a unified understanding of the current state of digitization in their organization. This article closes this research gap and presents the development of a novel maturity model for construction companies in the context of Construction Industry 4.0, the Digital Construction Company Maturity Model (DCCMM). Based on a literature review, the appropriate technologies used in the construction industry are identified and the basic requirements for the maturity model are defined. Once implemented, the model comprises five dimensions and 28 assessment parameters that describe digital transformation across six maturity levels. The conceptual model is tested and validated in eight construction companies. This is done in the context of qualitative interviews. The DCCMM serves as a holistic framework for the individual classification of companies in terms of digital transformation. This provides construction companies with a transparent and comprehensible indication of the degree of digitalization of their own structures. The result will make a significant contribution to further digitalization in the construction industry.
引用
收藏
页码:778 / 809
页数:48
相关论文
共 50 条
[21]   Comprehensive Review of Digital Maturity Model and Proposal for A Continuous Digital Transformation Process with Digital Maturity Model Integration [J].
Hoang Pham Minh ;
Hong Pham Thi Thanh .
INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2022, 22 (01) :741-757
[22]   COMPREHENSIVE REVIEW OF A DIGITAL MATURITY MODEL AND PROPOSAL FOR A CONTINUOUS DIGITAL TRANSFORMATION PROCESS WITH DIGITAL MATURITY MODEL INTEGRATION [J].
Minh, Hoang Pham ;
Thanh, Hong Pham Thi .
SISTEMAS & GESTAO, 2022, 17 (01) :89-103
[23]   Preparedness of companies for digital transformation and creating a competitive advantage in the age of Industry 4.0 [J].
Adamik, Anna ;
Nowicki, Michal .
PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON BUSINESS EXCELLENCE, 2018, 12 (01) :10-24
[24]   Development and Implementation of a Maturity Model of Digital Transformation [J].
Dirk Ifenthaler ;
Marc Egloffstein .
TechTrends, 2020, 64 :302-309
[25]   Development and Implementation of a Maturity Model of Digital Transformation [J].
Ifenthaler, Dirk ;
Egloffstein, Marc .
TECHTRENDS, 2020, 64 (02) :302-309
[26]   Assessment Model to Support the Technological Integration within Industrial Companies in the Context of Industry 4.0 [J].
Widmer, Neal ;
Hassan, Alaa ;
Monticolo, Davy .
2022 IEEE 28TH INTERNATIONAL CONFERENCE ON ENGINEERING, TECHNOLOGY AND INNOVATION (ICE/ITMC) & 31ST INTERNATIONAL ASSOCIATION FOR MANAGEMENT OF TECHNOLOGY, IAMOT JOINT CONFERENCE, 2022,
[27]   Digital transformation in the construction industry: a bibliometric review [J].
Adekunle, Samuel Adeniyi ;
Aigbavboa, Clinton Ohis ;
Ejohwomu, Obuks ;
Adekunle, Emmanuel Abiodun ;
Thwala, Wellington Didibhuku .
JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2021, 22 (01) :130-158
[28]   A Maturity Model for Resilient Safety Culture Development in Construction Companies [J].
Minh Tri Trinh ;
Feng, Yingbin .
BUILDINGS, 2022, 12 (06)
[29]   A Fuzzy Inference Model to Identify the Current Industry Maturity Stage in the Transformation Process to Industry 4.0 [J].
Gomes, Alexandre de Oliveira ;
Basilio, Joao C. C. .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2024, 21 (02) :1607-1622
[30]   Extended Maturity Model for Digital Transformation [J].
Soares, Nuno ;
Monteiro, Paula ;
Duarte, Francisco J. ;
Machado, Ricardo J. .
COMPUTATIONAL SCIENCE AND ITS APPLICATIONS, ICCSA 2021, PT IV, 2021, 12952 :183-200