Examining the Impact of Material Management Practices on Project Performance in the Construction Industry

被引:3
作者
Yildiz, Serkan [1 ]
Gunes, Sinan [1 ]
Kivrak, Serkan [2 ]
机构
[1] Ankara Univ, Dept Real Estate Dev & Management, TR-06590 Ankara, Turkiye
[2] Eskisehir Tech Univ, Dept Civil Engn, TR-26555 Eskisehir, Turkiye
关键词
material management; project performance; procurement; handling; stock; PRODUCTIVITY; OPTIMIZATION;
D O I
10.3390/buildings14072076
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the construction industry, much of the construction process is controlled by materials, and material management has a direct impact on many performance criteria such as cost, time, quality, and efficiency. This study examined the impact on project performance of activities that make up the material management process: planning, supply, logistics, transport, stock, and waste control of building materials. Material management practices were measured using 15 criteria under five different headings, and project performance was measured using 13 criteria under three different headings, through surveys of industry personnel at various construction sites. Multiple regression analyses were performed on the data obtained. The impacts of material management practices on project time, project cost, project efficiency, and waste performance, as well as overall project performance were examined using multiple regression analyses. The analysis showed that material supply, material handling, and stock and waste control had positive impacts on overall project performance, while material planning and material logistics did not have statistically significant impacts. It is concluded that the results of the study will help to better understand the relationship between material management and project performance and will help stakeholders to improve their material management practices.
引用
收藏
页数:21
相关论文
共 89 条
[31]  
Gulghane A A., 2015, Int. J. Eng. Res. Appl, V5, P59
[32]  
Helmstater G., 1964, Principles of Psychological Measurement
[33]  
Herath S, 2021, OPER SUPPLY CHAIN MA, V14, P431
[34]  
Hughes Rami, 2014, Construction Innovation, V14, P210, DOI 10.1108/CI-03-2013-0016
[35]   Factors Affecting Construction Labor Productivity in Kuwait [J].
Jarkas, Abdulaziz M. ;
Bitar, Camille G. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (07) :811-820
[36]   A solution to minimum sample size for regressions [J].
Jenkins, David G. ;
Quintana-Ascencio, Pedro F. .
PLOS ONE, 2020, 15 (02)
[37]  
Jobin PC, 2019, International Journal of Advances in Nursing Management, V7, P383, DOI [10.5958/2454-2652.2019.00090.8, 10.5958/2454-2652.2019.00090.8, DOI 10.5958/2454-2652.2019.00090.8]
[38]  
Jusoh Z.M., 2016, P MATEC WEB C
[39]  
Kanimozhi G., 2014, Indian J. Appl. Res, V4, P1, DOI [DOI 10.36106/IJAR, 10.15373/2249555X/APR2014/263, DOI 10.15373/2249555X/APR2014/263]
[40]   EFFECT OF BASIC MOTIVATIONAL FACTORS ON CONSTRUCTION WORKFORCE PRODUCTIVITY IN TURKEY [J].
Kazaz, Aynur ;
Manisali, Ekrem ;
Ulubeyli, Serdar .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2008, 14 (02) :95-106