Study on deformation mechanism and roof pre-splitting control technology of gob-side entry in thick hard main roof full-mechanized longwall caving panel

被引:2
作者
Wang, Hao-sen [1 ,2 ,3 ,5 ]
He, Man-chao [1 ]
Wang, Jiong [1 ]
Yang, Gang [1 ,2 ]
Ma, Zi-min [1 ,4 ]
Ming, Can [1 ,2 ]
Wang, Rui [5 ]
Feng, Zeng-chao [1 ,2 ]
Zhang, Wen-jie [1 ,2 ]
机构
[1] China Univ Min & Technol, State Key Lab Geomech & Deep Underground Engn, Beijing 100083, Peoples R China
[2] China Univ Min & Technol, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
[3] Univ British Columbia, NBK Inst Min Engn, Vancouver, BC V6T 1Z4, Canada
[4] Shandong Univ Technol, Sch Resource & Environm Engn, Zibo 255000, Peoples R China
[5] Xinjiang Inst Engn, Min Engn & Geol Coll, Urumqi 830023, Peoples R China
基金
中国国家自然科学基金;
关键词
deformation mechanism; hard roof; gob-side entry; cantilever beam; roof pre-splitting; COAL PILLAR; STABILITY; ROCK; EXCAVATION; PREDICTION; MODELS;
D O I
10.1007/s11771-024-5719-z
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
This paper explores the deformation mechanism and control technology of roof pre-splitting for gob-side entries in hard roof full-mechanized longwall caving panel (LTCC). The investigation utilizes a comprehensive approach that integrates field monitoring, theoretical analysis, and numerical simulation. Theoretical analysis has illuminated the influence of the length of the lateral cantilever beam of the main roof (LCBM) above the roadway on the stability of the gob-side entry behind the panel. Numerical simulations have further revealed that the longer LCBM results in heightened vertical stress within the coal pillar, developed cracks around the roadway, and more pronounced damage to the roadway. Moreover, numerical simulations also demonstrate the potential of roof pre-splitting technology in optimizing the fracture position of the hard roof. This technology significantly reduces the length of the LCBM, thereby alleviating stress concentration in the coal pillars and integrated coal rib while minimizing the destruction of the gob-side entry. Therefore, this manuscript first proposes the use of roof pre-splitting technology to control roadway deformation, and automatically retain the entry within a hard roof LTCC panel. Field implementation has demonstrated that the proposed automatically retained entry by roof pre-splitting technology effectively reduces gob-side entry deformation and achieves automatically retained entry.
引用
收藏
页码:3206 / 3224
页数:19
相关论文
共 42 条
[1]   Roof Deformation, Failure Characteristics, and Preventive Techniques of Gob-Side Entry Driving Heading Adjacent to the Advancing Working Face [J].
Bai, Jian-biao ;
Shen, Wen-long ;
Guo, Guan-long ;
Wang, Xiang-yu ;
Yu, Yang .
ROCK MECHANICS AND ROCK ENGINEERING, 2015, 48 (06) :2447-2458
[2]   Research and application of mechanical models for the whole process of 110 mining method roof structural movement [J].
Bian Wen-hui ;
Yang Jun ;
He Man-Chao ;
Zhu Chun ;
Xu Dong-ming .
JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2022, 29 (09) :3106-3124
[3]   Simulation of recovery of upper remnant coal pillar while mining the ultra-close lower panel using longwall top coal caving [J].
Feng, Guorui ;
Wang, Pengfei .
INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2020, 30 (01) :55-61
[4]   Stability of Gate Roads Next to an Irregular Yield Pillar: A Case Study [J].
Feng, Guorui ;
Wang, Pengfei ;
Chugh, Yoginder P. .
ROCK MECHANICS AND ROCK ENGINEERING, 2019, 52 (08) :2741-2760
[5]  
Gao F., 2013, SIMULATION FAILURE M
[6]   Discrete element modelling of deformation and damage of a roadway driven along an unstable goaf - A case study [J].
Gao, Fuqiang ;
Stead, Doug ;
Kang, Hongpu ;
Wu, Yongzheng .
INTERNATIONAL JOURNAL OF COAL GEOLOGY, 2014, 127 :100-110
[7]  
[高魁 Gao Kui], 2013, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V32, P1588
[8]   Meso- and macroeffects of roof split blasting on the stability of gateroad surroundings in an innovative nonpillar mining method [J].
Gao, Yubing ;
Wang, Yajun ;
Yang, Jun ;
Zhang, Xingyu ;
He, Manchao .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 90 :99-118
[9]   Mechanical Analysis of Weakly Cemented Roof of Gob-side Entry Retaining in Fully-Mechanized Top Coal Caving Mining [J].
Gu, Qingheng ;
Ru, Wenkai ;
Tan, Yunliang ;
Ning, Jianguo ;
Xu, Qiang .
GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (04) :2977-2984
[10]   Pressure relief and structure stability mechanism of hard roof for gob-side entry retaining [J].
Han Chang-liang ;
Zhang Nong ;
Li Bao-yu ;
Si Guang-yao ;
Zheng Xi-gui .
JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2015, 22 (11) :4445-4455