Fuzzy financial risk analysis of net-zero transitions in public-private partnership projects in Ghana

被引:3
作者
Akomea-Frimpong, Isaac [1 ]
Jin, Xiaohua [1 ]
Osei-Kyei, Robert [1 ]
机构
[1] Western Sydney Univ, Sch Engn Design & Built Environm, Sydney, Australia
关键词
Financial risks; Fuzzy synthetic model; PPP projects; Net-zero; Sustainability; Survey questionnaire; CRITICAL SUCCESS FACTOR; BOT HIGHWAY PROJECT; PPP PROJECTS; MANAGEMENT; MODEL; IDENTIFICATION; FRAMEWORK; RANKING;
D O I
10.1108/JFM-01-2024-0012
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
PurposeAmong the topmost challenges, limiting the transformation of conventional public-private partnership (PPP) projects to meet net-zero targets is financial risk. This challenge is more prevalent in PPP projects in developing economies like Ghana, where financial investments have dwindled due to the recent COVID-19 recession. This paper aims to assess the key financial challenges in transitioning to net-zero PPP projects in Ghana.Design/methodology/approachThe research method process was set as follows. First, a review of the literature to identify the major financial risks from journal articles, project reports and documents was undertaken, followed by questionnaire development and collection of data. Finally, the analysis of 134 questionnaire data was examined with the fuzzy synthetic evaluation.FindingsThe results indicate that the following financial challenges could hinder the transition to net-zero PPP projects in the country: increasing borrowing charges to build net-zero PPP projects due to the global covid-economic recession, poor project financial management, unstable local capital market and excessive labour, health and safety costs.Research limitations/implicationsAlthough, the study was conducted in Ghana, a country in the Sub-Saharan African region, the outcomes have significant impacts for similar developing countries in research investigations into the problem.Practical implicationsAssistance is provided in this study for PPP project practitioners in identifying the key financial challenges and possible strategies to mitigate them.Originality/valueTowards net-zero sustainability, this study highlights the crucial financial barriers to overcome in the rapid transition to climate change and zero carbon solutions in PPP projects.
引用
收藏
页数:28
相关论文
共 118 条
[1]   Shades of Grey: Guidelines for Working with the Grey Literature in Systematic Reviews for Management and Organizational Studies [J].
Adams, Richard J. ;
Smart, Palie ;
Huff, Anne Sigismund .
INTERNATIONAL JOURNAL OF MANAGEMENT REVIEWS, 2017, 19 (04) :432-454
[2]   A fuzzy synthetic evaluation of the challenges of smart city development in developing countries [J].
Aghimien, Douglas Omoregie ;
Aigbavboa, Clinton ;
Edwards, David J. ;
Mahamadu, Abdul-Majeed ;
Olomolaiye, Paul ;
Nash, Hazel ;
Onyia, Michael .
SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2022, 11 (03) :405-421
[3]   Fuzzy Analysis of Financial Risk Management Strategies for Sustainable Public-Private Partnership Infrastructure Projects in Ghana [J].
Akomea-Frimpong, Isaac ;
Jin, Xiaohua ;
Osei-Kyei, Robert .
INFRASTRUCTURES, 2024, 9 (04)
[4]   A review of circular economy models and success factors on public-private partnership infrastructure development [J].
Akomea-Frimpong, Isaac ;
Jin, Xiaohua ;
Kyei, Robert Osei ;
Tetteh, Portia Atswei ;
Tumpa, Roksana Jahan ;
Ofori, Joshua Nsiah Addo ;
Pariafsai, Fatemeh .
BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2024, 14 (01) :109-126
[5]   Mapping Studies on Sustainability in the Performance Measurement of Public-Private Partnership Projects: A Systematic Review [J].
Akomea-Frimpong, Isaac ;
Jin, Xiaohua ;
Osei-Kyei, Robert .
SUSTAINABILITY, 2022, 14 (12)
[6]   Green finance for green buildings: A systematic review and conceptual foundation [J].
Akomea-Frimpong, Isaac ;
Kukah, Augustine Senanu ;
Jin, Xiaohua ;
Osei-Kyei, Robert ;
Pariafsai, Fatemeh .
JOURNAL OF CLEANER PRODUCTION, 2022, 356
[7]   A critical review of public-private partnerships in the COVID-19 pandemic: key themes and future research agenda [J].
Akomea-Frimpong, Isaac ;
Jin, Xiaohua ;
Osei-Kyei, Robert ;
Tumpa, Roksana Jahan .
SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2023, 12 (04) :701-720
[8]   Public-private partnerships for sustainable infrastructure development in Ghana: a systematic review and recommendations [J].
Akomea-Frimpong, Isaac ;
Jin, Xiaohua ;
Osei-Kyei, Robert ;
Kukah, Augustine Senanu .
SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2023, 12 (02) :237-257
[9]   Managing financial risks to improve financial success of public-private partnership projects: a theoretical framework [J].
Akomea-Frimpong, Isaac ;
Jin, Xiaohua ;
Osei-Kyei, Robert .
JOURNAL OF FACILITIES MANAGEMENT, 2022, 20 (05) :629-651
[10]   A holistic review of research studies on financial risk management in public-private partnership projects [J].
Akomea-Frimpong, Isaac ;
Jin, Xiaohua ;
Osei-Kyei, Robert .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (09) :2549-2569