Cost Estimation of Metro Construction Projects Using Interpretable Machine Learning

被引:0
作者
Meng, Chuncheng [1 ]
Qu, Daoyuan [2 ]
Duan, Xiaochen [1 ]
机构
[1] Shijiazhuang Tiedao Univ, Sch Management, 17 Beierhuan East Rd, Shijiazhuang 050043, Peoples R China
[2] Shijiazhuang Tiedao Univ, Shijiazhuang 050043, Peoples R China
基金
中国国家自然科学基金;
关键词
Metro construction projects; Cost estimation; Interpretable machine learning; Light gradient boosting machine (LightGBM); Shapley additive explanations (SHAP); REGRESSION-ANALYSIS; MODEL; OPTIMIZATION;
D O I
10.1061/JCCEE5.CPENG-6018
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The metro, renowned as an environmentally friendly mode of transportation due to its low energy consumption and minimal pollution, plays a crucial role in achieving sustainable urban growth. Due to the scarcity of information in the early stages of metro construction projects and the subjectivity of cost estimation (which relies heavily on the estimator's experience), it is always difficult to guarantee the accuracy of metro construction project cost estimation. Furthermore, the existing methodological models commonly used for cost estimation do not adequately consider the interpretability of the estimation results, making it difficult to promote their application in real-world scenarios. In this paper, an interpretable machine learning method is introduced into the study of cost estimation of metro construction projects, and a maximum relevance and minimum redundancy (mRMR)-light gradient boosting machine (LightGBM)-Shapley additive explanations (SHAP) interpretable assisted investment decision-making framework is proposed. The results show that the negative impact of variable multicollinearity on model prediction is avoided by quantitatively identifying the key driving variables of costing through mRMR based on the historical data of metro construction projects and macroeconomic data. LightGBM is employed to predict the cost of metro construction projects with a mean absolute percentage error of 13.00%, surpassing the accuracy of the five baseline models. The SHAP method's introduction explains the influence of key driving variables on the model prediction response at both global and local levels, which improves the decision trust of the cost estimation of metro construction projects. The study takes into account the impact of key driving variables on the model's prediction response in a real-world context and balances the needs for estimation accuracy and variable interpretability in real-world scenarios. In this study, we propose a new interpretable machine learning method that helps improve the decision trust of cost estimation for metro construction projects. We use the mRMR module to identify the key driving variables for cost. Based on the LightGBM module, we accurately fit the nonlinear relationship between the cost of metro construction projects and the key variables. The SHAP algorithm is introduced to analyze the effects of the key driving variables on the prediction of the model at both global and local levels. The combined mRMR-LightGBM-SHAP model is proven to have better prediction accuracy than the traditional prediction model under the same conditions, and the SHAP response results prove the reliability of the model prediction. The study also found that the inclusion of economic environment variables plays a positive role in improving the accuracy of cost estimation for metro construction projects. The research results can be mainly used by metro investment units to quickly confirm or review the cost of metro construction projects, and they can also help government departments pay close attention to the impact of the external economic environment on the cost of metro construction.
引用
收藏
页数:14
相关论文
共 50 条
[31]   Role of National Conditions in Occupational Fatal Accidents in the Construction Industry Using Interpretable Machine Learning Approach [J].
Koc, Kerim .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2023, 39 (06)
[32]   Machine Learning Models for Software Cost Estimation [J].
Al Asheeri, Mahmood Mohd ;
Hammad, Mustafa .
2019 INTERNATIONAL CONFERENCE ON INNOVATION AND INTELLIGENCE FOR INFORMATICS, COMPUTING, AND TECHNOLOGIES (3ICT), 2019,
[33]   Development of an Interpretable Maritime Accident Prediction System Using Machine Learning Techniques [J].
Kim, Gyeongho ;
Lim, Sunghoon .
IEEE ACCESS, 2022, 10 :41313-41329
[34]   Machine Learning Algorithms for Construction Projects Delay Risk Prediction [J].
Gondia, Ahmed ;
Siam, Ahmad ;
El-Dakhakhni, Wael ;
Nassar, Ayman H. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (01)
[35]   LEAST SQUARE MOMENT BALANCED MACHINE: A NEW APPROACH TO ESTIMATING COST TO COMPLETION FOR CONSTRUCTION PROJECTS [J].
Cheng, Min-Yuan ;
Khasani, Riqi Radian .
JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2024, 29 :503-524
[36]   Rapid estimation of battery state of health using partial electrochemical impedance spectra and interpretable machine learning [J].
Xia, Bizhong ;
Qin, Zhanpeng ;
Fu, Hongye .
JOURNAL OF POWER SOURCES, 2024, 603
[37]   Cost Calculation of Construction Projects Including Sustainability Factors Using the Case Based Reasoning (CBR) Method [J].
Lesniak, Agnieszka ;
Zima, Krzysztof .
SUSTAINABILITY, 2018, 10 (05)
[38]   Establishing formalized representation of standards for construction cost estimation by using ontology learning [J].
Liu, Zhe ;
Ma, Zhiliang .
CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 :291-299
[39]   A contingency approach for time-cost trade-off in construction projects based on machine learning techniques [J].
Wang, Peipei ;
Wang, Kun ;
Huang, Yunhan ;
Fenn, Peter .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) :4677-4695
[40]   An integrated BIM-based approach for cost estimation in construction projects [J].
Fazeli, Abdulwahed ;
Dashti, Mohammad Saleh ;
Jalaei, Farzad ;
Khanzadi, Mostafa .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (09) :2828-2854