Choosing the Right Construction Method: A Comparative Study of Cost and Timeline for Top-Down and Bottom-Up Approaches

被引:1
作者
Meral, Cetin [1 ]
Temel, Bayram Ali [1 ]
Basaga, Hasan Basri [1 ]
机构
[1] Karadeniz Tech Univ, Dept Civil Engn, TR-61080 Trabzon, Turkiye
关键词
construction management; construction performance; construction efficiency; top-down construction method; EXCAVATION; WALL; PERFORMANCE; BUILDINGS; MOVEMENTS; COLUMN; SYSTEM;
D O I
10.3390/buildings14082381
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The selection of an appropriate construction method stands as a pivotal decision in ensuring the success of any building project. This paper undertakes a comprehensive comparative analysis of cost and timeline implications between the top-down and bottom-up construction methodologies. The research focuses on ten distinct underground structure models, each characterized by varying depths and base areas. Through rigorous design and analysis, the cost and projected duration for each model are meticulously evaluated under the lens of both top-down and bottom-up construction techniques. The findings reveal that while the bottom-up approach emerges as the most cost-effective alternative at a depth of 8 m, the top-down method exhibits superior cost efficiency with increasing depth. Interestingly, alterations in the structure's base area exert a minimal influence on the cost differentials between the two methodologies. Moreover, the top-down construction method consistently outshines its counterpart in terms of project duration across all ten models examined, with the percentage increase in base area yielding insignificant impacts on project timeline discrepancies. This study furnishes construction project managers with invaluable insights to navigate the complexities of method selection. By judiciously considering parameters such as project scale, depth, and base area, managers can strategically optimize both cost and timeline outcomes, thereby facilitating the seamless execution of construction projects.
引用
收藏
页数:18
相关论文
共 45 条
[1]   Construction of Plunge Column by using Top Down Construction Method [J].
Agrawal, Nikhil S. ;
Harne, Varsha ;
Chouhan, Jyoti ;
Gangwani, Laxmi .
HELIX, 2020, 10 (01) :170-173
[2]  
[Anonymous], 2013, IdeCAD Statik Version 7.022
[3]  
[Anonymous], 2015, SAP2000 Version: 17.1.1. Structural Analysis Program
[4]   Influence of Concrete Time-Dependent Effects on the Performance of Top-Down Construction [J].
Arboleda-Monsalve, Luis G. ;
Finno, Richard J. .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2015, 141 (04)
[5]  
Basarkar S.S., 2013, IOSR J. Mech. Civ. Eng, P1
[6]   Influence of Different Construction Methods on Lateral Displacement of Diaphragm Walls in Large-Scale Unsupported Deep Excavation [J].
Chiu, Hao-Wei ;
Hsu, Chia-Feng ;
Tsai, Fu-Huan ;
Chen, Shong-Loong .
BUILDINGS, 2024, 14 (01)
[7]  
Crawley JD, 1996, GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, P93
[8]  
FINDLAY JD, 1989, PILING AND DEEP FOUNDATIONS, VOL 1, P199
[9]   Geodetic Accuracy in Observational Construction of an Excavation Stabilized by Top-Down Method: A Case Study [J].
Ghorbani, E. ;
Khodaparast, M. .
GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (06) :4759-4775
[10]  
HOLLINGSWORTH JR, 1991, PILING AND DEEP FOUNDATIONS, VOL 1, 1991, P79