Study on Multi-Objective Optimization of Construction Project Based on Improved Genetic Algorithm and Particle Swarm Optimization

被引:2
作者
Hu, Weicheng [1 ]
Zhang, Yan [2 ]
Liu, Linya [1 ]
Zhang, Pengfei [1 ]
Qin, Jialiang [1 ]
Nie, Biao [1 ]
机构
[1] East China Jiaotong Univ, State Key Lab Performance Monitoring & Protecting, Nanchang 330013, Peoples R China
[2] East China Jiaotong Univ, Sch Civil Engn & Architecture, Nanchang 330013, Peoples R China
基金
中国国家自然科学基金;
关键词
construction project; multi-objective optimization; genetic algorithm; particle swarm optimization; uncertainty analysis;
D O I
10.3390/pr12081737
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Construction projects require concurrent consideration of the three major objectives of construction period, cost, and quality. To address the multi-objective optimization issues of construction projects, mathematical models of construction period, quality, and cost are established, respectively, and multi-objective optimization models are constructed for different construction objectives. A hybrid optimization method combining an improved genetic algorithm (GA) with a time-varying mutation rate and a particle swarm algorithm (PSO) is proposed to optimize construction projects, which overcomes the shortcomings of the original GA and improves the global optimality and stability of results. Various construction projects were considered, and different construction objectives were analyzed individually. Finally, an uncertainty analysis is developed for the proposed GA-PSO algorithm and compared with GA and PSO. The results indicate that the proposed hybrid approach outperforms the PSO and GA algorithms in providing a better and more stable multi-objective optimized construction solution, with performance improvements of 4.3-8.5% and volatility reductions of 37.5-64.4%. This provides a reference for the optimal design of wind farms, buildings, and other construction projects.
引用
收藏
页数:31
相关论文
共 27 条
[1]   Application of chaos discrete particle swarm optimization algorithm on pavement maintenance scheduling problem [J].
Ahmed, Kawther ;
Al-Khateeb, Belal ;
Mahmood, Maher .
CLUSTER COMPUTING-THE JOURNAL OF NETWORKS SOFTWARE TOOLS AND APPLICATIONS, 2019, 22 (02) :S4647-S4657
[2]   A Two-Stage Stochastic Model for Maintenance and Rehabilitation Planning of Pavements [J].
Ameri, Mahmoud ;
Jarrahi, Armin ;
Haddadi, Farshad ;
Mirabimoghaddam, Mohammad Hasan .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019
[3]   Pavement Maintenance Decision Making Based on Optimization Models [J].
Bao, Shitai ;
Han, Keying ;
Zhang, Lan ;
Luo, Xudong ;
Chen, Shunqing .
APPLIED SCIENCES-BASEL, 2021, 11 (20)
[4]   Approaches for BIM-based multi-objective optimization in construction scheduling [J].
Essam, Noha ;
Khodeir, Laila ;
Fathy, Fatma .
AIN SHAMS ENGINEERING JOURNAL, 2023, 14 (06)
[5]  
France-Mensah J, 2018, CONSTRUCTION RESEARCH CONGRESS 2018: INFRASTRUCTURE AND FACILITY MANAGEMENT, P444
[6]   Wind farm layout optimization in complex terrain based on CFD and IGA-PSO [J].
Hu, Weicheng ;
Yang, Qingshan ;
Yuan, Ziting ;
Yang, Fucheng .
ENERGY, 2024, 288
[7]   A novel approach for wind farm micro-siting in complex terrain based on an improved genetic algorithm [J].
Hu, Weicheng ;
Yang, Qingshan ;
Chen, Hua-Peng ;
Guo, Kunpeng ;
Zhou, Tong ;
Liu, Min ;
Zhang, Jian ;
Yuan, Ziting .
ENERGY, 2022, 251
[8]   Coupled On-Site Measurement/CFD Based Approach for Wind Resource Assessment and Wind Farm Micro-Siting Over Complex Terrain [J].
Hu, Weicheng ;
Yang, Qingshan ;
Zhang, Jian ;
Hu, Jianxiao .
6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
[9]  
Huilin Chen, 2021, IOP Conference Series: Earth and Environmental Science, V676, DOI 10.1088/1755-1315/676/1/012111
[10]   AN INTEGRATED MULTI-OBJECTIVES OPTIMIZATION APPROACH ON MODELLING PAVEMENT MAINTENANCE STRATEGIES FOR PAVEMENT SUSTAINABILITY [J].
Ji, Ankang ;
Xue, Xiaolong ;
Wang, Yuna ;
Luo, Xiaowei ;
Zhang, Minggong .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2020, 26 (08) :717-732