Scheduling a two-stage assembly problem with separated setup time to minimise total tardiness

被引:0
|
作者
Luo, JianChao [1 ,2 ,3 ]
Liu, ZhiQiang [4 ]
Fan, JiaLi [5 ]
Wang, Jun-Qiang [6 ,7 ]
Feng, YanXiang [8 ,9 ]
Xu, Jun [10 ]
机构
[1] Northwestern Polytech Univ, Sch Software, Xian, Shaanxi, Peoples R China
[2] Yangtze River Delta Res Inst NPU, Taicang, Peoples R China
[3] Northwestern Polytech Univ Shenzhen, Res & Dev Inst, Shenzhen, Peoples R China
[4] Northwestern Polytech Univ, Sch Cybersecur, Xian, Peoples R China
[5] Naval Aviat Univ, Dept Shipboard Aviat Support & Stn Management, Qingdao Campus, Qingdao, Peoples R China
[6] Northwestern Polytech Univ, Performance Anal Ctr Prod & Operat Syst PacPos, Xian, Peoples R China
[7] Northwestern Polytech Univ, Sch Mech Engn, Dept Ind Engn, Xian, Peoples R China
[8] Xi An Jiao Tong Univ, State Key Lab Mfg Syst Engn, Xian, Peoples R China
[9] Xi An Jiao Tong Univ, Syst Engn Inst, Xian, Peoples R China
[10] Xidian Univ, Guangzhou Inst Technol, Adv Mfg Technol Innovat Ctr, Guangzhou, Peoples R China
基金
中国国家自然科学基金; 国家重点研发计划;
关键词
Scheduling; branch and bound; variable neighbourhood search; two-stage assembly; setup time; VARIABLE NEIGHBORHOOD SEARCH; FLOWSHOP; ALGORITHM; MAKESPAN; SYSTEM; SUM; FABRICATION; HEURISTICS; MACHINES;
D O I
10.1080/00207543.2024.2403766
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The two-stage assembly scheduling problem (TASP) is widely existed in our real-life. Minimising the total tardiness of all jobs is important for increasing customers' satisfaction. Although a few researchers have focused on such optimisation criterion, the performance of proposed algorithms depends on four or more fine-tuned parameters. This work focuses on TASPs with separated setup time. There are multiple and one machine at stages one and two, respectively. A branch and bound algorithm and a variable neighbourhood search (VNS) are proposed to minimise the total tardiness of all jobs. Both of them contain only one parameter, i.e. maximum CPU time, which needs no turning. In order to guide the search of the branch and bound algorithm, lower and upper bounds and dominance rules are proposed. In order to avoid VNS falling into local optima, three neighbourhoods and a novel shaking subroutine are proposed. Experimental results show that the proposed VNS outperforms all existing algorithms on thousands of large scale TASPs generated randomly. Branch and bound algorithm can not only ensure the optimal schedule for small scale TASPs but also enhance the search ability of the proposed VNS to some extent.
引用
收藏
页数:27
相关论文
共 50 条
  • [21] A study on open shop scheduling to minimise total tardiness
    Naderi, B.
    Ghomi, S. M. T. Fatemi
    Aminnayeri, M.
    Zandieh, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (15) : 4657 - 4678
  • [22] The multi-factory two-stage assembly scheduling problem
    Kazemi, Hamed
    Nourelfath, Mustapha
    Gendreau, Michel
    JOURNAL OF INDUSTRIAL INFORMATION INTEGRATION, 2024, 38
  • [23] Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
    Allahverdi, Ali
    Al-Anzi, Fawaz S.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (22) : 4713 - 4735
  • [24] An artificial immune system heuristic for two-stage multi-machine assembly scheduling problem to minimize total completion time
    Al-Anzi, Fawaz S.
    Allahverdi, Ali
    JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (04) : 825 - 830
  • [25] A discrete PSO for two-stage assembly scheduling problem
    Tian, Ye
    Liu, Dayou
    Yuan, Donghui
    Wang, Kunhao
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (1-4) : 481 - 499
  • [26] On the two-stage assembly flow shop problem
    Hadda, Hatem
    Dridi, Najoua
    Hajri-Gabouj, Sonia
    TOP, 2024, 32 (02) : 224 - 244
  • [27] An effective two-stage iterated greedy algorithm to minimize total tardiness for the distributed flowshop group scheduling problem
    Wang, Zhi-Yuan
    Pan, Quan-Ke
    Gao, Liang
    Wang, Yu -Long
    SWARM AND EVOLUTIONARY COMPUTATION, 2022, 74
  • [28] A two-stage three-machine assembly scheduling problem with a truncation position-based learning effect
    Azzouz, Ameni
    Pan, Po-An
    Hsu, Peng-Hsiang
    Lin, Win-Chin
    Liu, Shangchia
    Ben Said, Lamjed
    Wu, Chin-Chia
    SOFT COMPUTING, 2020, 24 (14) : 10515 - 10533
  • [29] Lagrangian relaxation and cut generation for sequence-dependent setup time flowshop scheduling problems to minimise the total weighted tardiness
    Nishi, Tatsushi
    Hiranaka, Yuichiro
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (16) : 4778 - 4796
  • [30] A two-stage three-machine assembly scheduling problem with deterioration effect
    Wu, Chin-Chia
    Azzouz, Ameni
    Chung, I-Hong
    Lin, Win-Chin
    Ben Said, Lamjed
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (21) : 6634 - 6647