An adaptive shuffled frog-leaping algorithm for flexible flow shop scheduling problem with batch processing machines

被引:1
作者
Lei, Deming [1 ]
He, Chenyu [1 ]
机构
[1] Wuhan Univ Technol, Sch Automat, Wuhan 430070, Peoples R China
基金
中国国家自然科学基金;
关键词
Flexible flow shop; Batch processing machine; Transportation; Adaptive shuffled frog-leaping algorithm; HYBRID FLOWSHOP; MINIMIZING MAKESPAN;
D O I
10.1016/j.asoc.2024.112230
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Batch Processing Machines (BPM) and transportation are seldom studied simultaneously in Flexible Flow Shop. In this study, Flexible Flow Shop Scheduling Problem (FFSP) with BPM at the last stage and transportation is considered and an adaptive shuffled frog-leaping algorithm (ASFLA) is proposed to minimize makespan. To produce high-quality solutions, a heuristic is employed to produce initial solution, two groups are formed by using all memeplexes, then an adaptive memeplex search is implemented, in which the number of searches is dynamically determined by the quality of the memeplex, an adaptive group search is also conducted by exchanging memeplexes or supporting of the worse memeplex. A novel population shuffling and the worst memeplex elimination are proposed. A number of computational experiments are executed to test the new strategies and performances of ASFLA. Computational results demonstrate that new strategies are effective and ASFLA is a very competitive algorithm for FFSP with BPM and transportation.
引用
收藏
页数:12
相关论文
共 48 条
[1]   Hybrid flow shop scheduling with parallel batching [J].
Amin-Naseri, Mohammad Reza ;
Beheshti-Nia, Mohammad Ali .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 117 (01) :185-196
[2]   A parallel hybrid PSO-GA algorithm for the flexible flow-shop scheduling with transportation [J].
Amirteimoori, Arash ;
Mahdavi, Iraj ;
Solimanpur, Maghsud ;
Ali, Sadia Samar ;
Tirkolaee, Erfan Babaee .
COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 173
[3]   Scheduling hybrid flowshop with parallel batching machines and compatibilities [J].
Bellanger, A. ;
Oulamara, A. .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (06) :1982-1992
[4]   A complex time based construction heuristic for batch scheduling problems in the chemical industry [J].
Burkard, Rainer E. ;
Hatzl, Johannes .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 174 (02) :1162-1183
[5]   A cooperated shuffled frog-leaping algorithm for distributed energy-efficient hybrid flow shop scheduling with fuzzy processing time [J].
Cai, Jingcao ;
Lei, Deming .
COMPLEX & INTELLIGENT SYSTEMS, 2021, 7 (05) :2235-2253
[6]  
Chen L, 2015, IEEE C EVOL COMPUTAT, P814, DOI 10.1109/CEC.2015.7256975
[7]   Heuristics to minimize makespan of parallel batch processing machines [J].
Damodaran, Purushothaman ;
Chang, Ping-Yu .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 37 (9-10) :1005-1013
[8]   Shuffled frog-leaping algorithm: a memetic meta-heuristic for discrete optimization [J].
Eusuff, M ;
Lansey, K ;
Pasha, F .
ENGINEERING OPTIMIZATION, 2006, 38 (02) :129-154
[9]   Flow shop scheduling with variable processing times based on differential shuffled frog leaping algorithm [J].
Gao, Zhijun ;
Peng, Jiayu ;
Han, Zhonghua ;
Jia, Meiqi .
INTERNATIONAL JOURNAL OF MODELLING IDENTIFICATION AND CONTROL, 2019, 33 (02) :179-187
[10]   A simulation-optimization model for solving flexible flow shop scheduling problems with rework and transportation [J].
Gheisariha, Elmira ;
Tavana, Madjid ;
Jolai, Fariborz ;
Rabiee, Meysam .
MATHEMATICS AND COMPUTERS IN SIMULATION, 2021, 180 (180) :152-178