INTEROPERABLE MIXED REALITY FOR FACILITY MANAGEMENT: A CYBER-PHYSICAL PERSPECTIVE

被引:0
作者
Vaccarini, Massimo [1 ]
Spegni, Francesco [1 ]
Giretti, Alberto [1 ]
Pirani, Massimiliano [2 ]
Carbonari, Alessandro [1 ]
机构
[1] Univ Politecn Marche, Dept Civil & Bldg Engn & Architecture, Ancona, Italy
[2] Univ Politecn Marche, Dept Informat Engn, Ancona, Italy
来源
JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION | 2024年 / 29卷
关键词
Building Commissioning; Interoperability; BIM; Cyber-physical; Mixed Reality; INFORMATION; SYSTEM; MODEL;
D O I
10.36680/j.itcon.2024.026
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The management of building commissioning requires specialists from different organizations and with different skills. Collaboration processes involves several actors and decision-making at different levels. As building commissioning has already been described as systems-of-systems (SoS), the research reported in this paper claims that this definition can be extended into cyber-physical system-of-systems (CPSoS), requiring identification and support of both human-machine and machine-machine interactions in a hybrid environment. These requirements give rise to several challenges, such as capturing information about the existing facility, visualizing, comparing, and validating the compliance of alternative commissioning projects. The study presented in this paper reports methodological and technological solutions that are built on the integration between BIM and mixed reality, to actualize a CPSoS paradigm and to implement human-machine interaction for situated cognition towards an immersive collaborative working environment. The results of the experimental platform have been showcased in a full-scale real-life demonstrator.
引用
收藏
页码:573 / 595
页数:23
相关论文
共 62 条
[1]  
Aful - Association Francophone des Utilisateurs de Linux, 2015, Interop Working Group comments on the Gartner Final Report concerning the Revision of the European Interoperability Framework (EIF) and Architecture Guidelines (AG)
[2]   Cyber-physical postural training system for construction workers [J].
Akanmu, Abiola A. ;
Olayiwola, Johnson ;
Ogunseiju, Omobolanle ;
McFeeters, David .
AUTOMATION IN CONSTRUCTION, 2020, 117
[3]  
Ammari K.E, 2014, SENSING ISSUES CIVIL, DOI DOI 10.1061/9780784413616.082
[4]  
Annaswamy A. M., 2023, Cyber-Physical-Human Systems: Fundamentals and Applications
[5]  
[Anonymous], 2018, 1965012018 ISO
[6]  
Ataizi M., 2012, Encyclopedia of the Sciences of Learning, DOI [10.1007/978-1-4419-1428-616, DOI 10.1007/978-1-4419-1428-616]
[7]   Architecting systems-of-systems and their constituents: A case study applying Industry 4.0 in the construction domain [J].
Axelsson, Jakob ;
Froberg, Joakim ;
Eriksson, Peter .
SYSTEMS ENGINEERING, 2019, 22 (06) :455-470
[8]  
Ayer SK, 2014, J INF TECHNOL CONSTR, V19, P520
[9]   Multi-paradigm modeling for cyber-physical systems: A systematic mapping review [J].
Barisic, Ankica ;
Ruchkin, Ivan ;
Savic, Dusan ;
Mohamed, Mustafa Abshir ;
Al-Ali, Rima ;
Li, Letitia W. ;
Mkaouar, Hana ;
Eslampanah, Raheleh ;
Challenger, Moharram ;
Blouin, Dominique ;
Nikiforova, Oksana ;
Cicchetti, Antonio .
JOURNAL OF SYSTEMS AND SOFTWARE, 2022, 183
[10]  
Baur C., 2015, McKinsey