Streamlining Project Management in the Production Sector: A Case Study of Industrial Engineering

被引:0
|
作者
Zuzik, Jan [1 ]
Furmannova, Beata [1 ]
Dulina, Luboslav [1 ,2 ]
机构
[1] Univ Zilina, Fac Mech Engn, Dept Ind Engn, Univ 8215-1, Zilina 01026, Slovakia
[2] Univ Bielsko Biala, Fac Mech Engn & Comp Sci, Dept Ind Engn, Bielsko Biala, Poland
关键词
Industrial Engineering; Project Management; MCT map; Gantt chart; Project; SYSTEM; SIMULATION; DESIGN;
D O I
10.24425/mper.2024.151133
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The objective of the research is to pinpoint issues in project management, as this is crucial for the development of a successful project. There is a need to expand the existing knowledge in project management, as it contributes to enhancing a company's project management system. Additionally, the study presents effective remedies for project management challenges. Initially, we introduce the specific project, followed by an examination of the current state of production processes. In this context, we endeavour to propose solutions. The concluding section focuses on evaluating these solutions, summarizing the study, and achieving the study's objective. These outcomes contribute to cost savings and ensure maximum customer satisfaction.
引用
收藏
页码:85 / 98
页数:14
相关论文
共 50 条
  • [31] Project management for engineering design
    Lessard, Charles
    Lessard, Joseph
    Synthesis Lectures on Engineering, 2007, 2 : 1 - 111
  • [32] Comprehensive Reorganization of Project Management: A Case Study
    Apaolaza, Unai
    Lizarralde, Aitor
    PROJECT MANAGEMENT AND ENGINEERING RESEARCH, AEIPRO 2016, 2017, : 3 - 17
  • [33] Case study of project management process improvement
    Kramarenko, S.
    Karaulova, T.
    Annals of DAAAM for 2006 & Proceedings of the 17th International DAAAM Symposium: INTELLIGENT MANUFACTURING & AUTOMATION: FOCUS ON MECHATRONICS AND ROBOTICS, 2006, : 209 - 210
  • [34] Managing Globally Distributed Engineering Teams: A Case Study on Virtual Industrial Engineering
    Domschke, M.
    Bog, A.
    Uflacker, M.
    Zeier, A.
    2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 586 - 589
  • [35] Engineering, Procurement and Construction (EPC) Project Management for Reducing Cost and Time: A Case Study of Petrochemical Plant
    Sangroungrai, Supakan
    Sukchareonpong, Pichit
    Witchakul, Suwitchaporn
    PROCEEDINGS OF 2018 5TH INTERNATIONAL CONFERENCE ON BUSINESS AND INDUSTRIAL RESEARCH (ICBIR): SMART TECHNOLOGY FOR NEXT GENERATION OF INFORMATION, ENGINEERING, BUSINESS AND SOCIAL SCIENCE, 2018, : 402 - 406
  • [36] A Study of the Functional Mechanism of Petrochemical Engineering Construction Project Management
    Wang, Ji-ming
    FRONTIERS OF ENGINEERING MANAGEMENT, 2014, 1 (02) : 129 - 139
  • [37] Third Sector Institutions associated to education areas in Brazil and their impact in curricular references for modernizing industrial engineering courses: A case study
    Fuentes Rivera, Roberto Miguel
    Martins Marcal, Rui Francisco
    Vieira Junior, Milton
    Amorim, Marlene
    Guimaraes, Gil Eduardo
    PROCEEDINGS OF THE 2020 IEEE GLOBAL ENGINEERING EDUCATION CONFERENCE (EDUCON 2020), 2020, : 1462 - 1470
  • [38] Improving project success: A case study using benefits and project management
    Gomes, Jorge
    Romao, Mario
    INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERIS/PROJMAN / HCIST 2016, 2016, 100 : 489 - 497
  • [39] The project management and the Engineering Management Information System
    Luo Hui
    Cheng Lin
    Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 395 - 400
  • [40] Integration as a project management concept: A study of the commissioning process in industrial deliveries
    Kirsilä, Johanna
    Hellström, Magnus
    Wikström, Kim
    International Journal of Project Management, 2007, 25 (07) : 714 - 721