Managing product-inherent constraints with artificial intelligence: production control for time constraints in semiconductor manufacturing

被引:2
|
作者
May, Marvin Carl [1 ]
Oberst, Jan [1 ]
Lanza, Gisela [1 ]
机构
[1] Karlsruhe Inst Technol KIT, Wbk Inst Prod Sci, Kaiserstr 12, D-76131 Karlsruhe, Germany
基金
欧盟地平线“2020”;
关键词
Complex job shop; Time constraint; Semiconductor manufacturing; Production control; 2-MACHINE FLOWSHOP; MIXED-INTEGER; OPTIMIZATION; ALGORITHM; CAPACITY; SHOP;
D O I
10.1007/s10845-024-02472-6
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Continuous product individualization and customization led to the advent of lot size one in production and ultimately to product-inherent uniqueness. As complexities in individualization and processes grow, production systems need to adapt to unique, product-inherent constraints by advancing production control beyond predictive, rigid schedules. While complex processes, production systems and production constraints are not a novelty per se, modern production control approaches fall short of simultaneously regarding the flexibility of complex job shops and product unique constraints imposed on production control. To close this gap, this paper develops a novel, data driven, artificial intelligence based production control approach for complex job shops. For this purpose, product-inherent constraints are resolved by restricting the solution space of the production control according to a prediction based decision model. The approach validation is performed in a real semiconductor fab as a job shop that includes transitional time constraints as product-inherent constraints. Not violating these time constraints is essential to avoid scrap and similarly increase quality-based yield. To that end, transition times are forecasted and the adherence to these product-inherent constraints is evaluated based on one-sided prediction intervals and point estimators. The inclusion of product-inherent constraints leads to significant adherence improvements in the production system as indicated in the real-world semiconductor manufacturing case study and, hence, contributes a novel, data driven approach for production control. As a conclusion, the ability to avoid a large majority of violations of time constraints shows the approaches effectiveness and the future requirement to more accurately integrate such product-inherent constraints into production control.
引用
收藏
页码:4259 / 4276
页数:18
相关论文
共 12 条
  • [1] Production Control in Semiconductor manufacturing with Time Constraints
    Sadeghi, Rezvan
    Dauzere-Peres, Stephane
    Yugma, Claude
    Lepelletier, Guillaume
    2015 26TH ANNUAL SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE (ASMC), 2015, : 29 - 33
  • [2] Multiple product admission control in semiconductor manufacturing systems with process queue time (PQT) constraints
    Wu, Cheng-Hung
    Chien, Wen-Chi
    Chuang, Ya-Tang
    Cheng, Yu-Ching
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 99 : 347 - 363
  • [3] SCHEDULING JOBS WITH TIME CONSTRAINTS BETWEEN CONSECUTIVE PROCESS STEPS IN SEMICONDUCTOR MANUFACTURING
    Klemmt, Andreas
    Moench, Lars
    2012 WINTER SIMULATION CONFERENCE (WSC), 2012,
  • [4] Scheduling for a flow shop with waiting time constraints and missing operations in semiconductor manufacturing
    Han, Jun-Hee
    Lee, Ju-Yong
    ENGINEERING OPTIMIZATION, 2023, 55 (10) : 1742 - 1759
  • [5] Analysis, design, and control of Bernoulli production lines with waiting time constraints
    Lee, Jun-Ho
    Zhao, Cong
    Li, Jingshan
    Papadopoulos, Chrissoleon T.
    JOURNAL OF MANUFACTURING SYSTEMS, 2018, 46 : 208 - 220
  • [6] Dynamic production control in parallel processing systems under process queue time constraints
    Wu, Cheng-Hung
    Lin, James T.
    Chien, Wen-Chi
    COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (01) : 192 - 203
  • [7] Scheduling of Single-Arm Multi-cluster Tools With Wafer Residency Time Constraints in Semiconductor Manufacturing
    Zhu, QingHua
    Wu, NaiQi
    Qiao, Yan
    Zhou, MengChu
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2015, 28 (01) : 117 - 125
  • [8] Production control policy for tandem workstations with constant service times and queue time constraints
    Wu, Kan
    Zhao, Ning
    Gao, Liang
    Lee, C. K. M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (21) : 6302 - 6316
  • [9] PRODUCTION CONTROL UNDER PROCESS QUEUE TIME CONSTRAINTS IN SYSTEMS WITH A COMMON DOWNSTREAM WORKSTATION
    Chen, Yu-Ting
    Wu, Cheng-Hung
    Tien, Yin-Jing
    Yu, Cheng-Juei
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2016, 23 (05): : 349 - 371
  • [10] Analysing the impact of production control policies on the dynamics of a two-product supply chain with capacity constraints
    Corsini, Roberto Rosario
    Costa, Antonio
    Cannella, Salvatore
    Framinan, Jose M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (06) : 1913 - 1937