Simulation on Flyrock due to Blasting Using Smoothed Particle Hydrodynamics (SPH) with LSDyna software

被引:0
作者
Dinh, Bao Tran [1 ,2 ]
Van, Trieu Do [1 ,2 ]
Van, Viet Pham [3 ]
An, Nguyen Dinh [1 ,2 ]
机构
[1] Hanoi Univ Min & Geol, 18 Vien St, Hanoi 100000, Vietnam
[2] Hanoi Univ Min & Geol, Innovat Sustainable & Responsible Min ISRM Res Grp, 18 Vien St, Hanoi 100000, Vietnam
[3] Inst Min Sci & Technol Vinacomin, Hanoi, Vietnam
来源
INZYNIERIA MINERALNA-JOURNAL OF THE POLISH MINERAL ENGINEERING SOCIETY | 2023年 / 02期
关键词
flyrock; smoothedparticle hydrodynamics; simulation; blasting; LS-Dyna; PREDICTION; PARAMETERS; MINE; DISTANCE; MODEL;
D O I
10.29227/IM-2023-02-08
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
In surface mining operation, blasting method has been commonly used and accounted highly for breaking waste rock and mineral. The main goal of the activity is fundamental fragmentation by energy generation due to blasting. However, only 20% to 30% blasting energy is generated to fragment rock. The remain energry is wasted for flyrock, ground vibration, air overpressure, dust and too fine fragmentation. Flyrock in blasting is large risk for surface mines and occupies more than a half of incidents relating to blasting at surface mines, because this is a severe issue and causes negative reaction of the surrounding residients. However, studies on flyrock-phenomenon prediction methods for blasting in Vietnam have been also limited. In the study, simulation analysis method on induce-blasting-induced flyrock experiment using Smoothed Particle Hydrodynamics (SPH) with LS-Dyna software. Two-dimension modelling was built and practically applied for B2 cross section of Mong Son quarry in Yen Bai province. The result showed that the ability of Smoothed Particle Hydrodynamics (SPH) in analysizing flyrock trajectory distance in blasting. By using the modelling with field-site parameters, the researcher monitored flyrock velocity at installed time periods, such as 1.5 second when the flyrocks fly with a maximum distance of 85 m from blasting site and their average velocity of 40 m/s.
引用
收藏
页码:13 / 21
页数:9
相关论文
共 43 条
  • [1] Studies on flyrock at limestone quarries
    Adhikari, GR
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 1999, 32 (04) : 291 - 301
  • [2] Stability evaluation of the Gumushane-Akcakale cave by numerical analysis method
    Alemdag, Selcuk
    Zeybek, Halil Ibrahim
    Kulekci, Gokhan
    [J]. JOURNAL OF MOUNTAIN SCIENCE, 2019, 16 (09) : 2150 - 2158
  • [3] Evaluation of flyrock phenomenon due to blasting operation by support vector machine
    Amini, Hasel
    Gholami, Raoof
    Monjezi, Masoud
    Torabi, Seyed Rahman
    Zadhesh, Jamal
    [J]. NEURAL COMPUTING & APPLICATIONS, 2012, 21 (08) : 2077 - 2085
  • [4] Blasting injuries in surface mining with emphasis on flyrock and blast area security
    Bajpayee, TS
    Rehak, TR
    Mowrey, GL
    Ingram, DK
    [J]. JOURNAL OF SAFETY RESEARCH, 2004, 35 (01) : 47 - 57
  • [5] Bhandari S., 1997, Engineering rock blasting operations
  • [6] Multiple regression, ANN and ANFIS models for prediction of backbreak in the open pit blasting
    Esmaeili, Mohammad
    Osanloo, Morteza
    Rashidinejad, Farshad
    Bazzazi, Abbas Aghajani
    Taji, Mohammad
    [J]. ENGINEERING WITH COMPUTERS, 2014, 30 (04) : 549 - 558
  • [7] Fletcher L. R., 1986, P 12 C EXPL BLAST TE, P167
  • [8] RETRACTED: Study on the 2D Optimization Simulation of Complex Five-Hole Cutting Blasting under Different Lateral Pressure Coefficients (Retracted Article)
    Gao, Jing
    Xie, Shizhen
    Zhang, Xiantang
    Wang, Hongli
    Gao, Wenle
    Zhou, Hongmin
    [J]. COMPLEXITY, 2020, 2020
  • [10] Application of artificial intelligence techniques for predicting the flyrock distance caused by blasting operation
    Ghasemi, Ebrahim
    Amini, Hasel
    Ataei, Mohammad
    Khalokakaei, Reza
    [J]. ARABIAN JOURNAL OF GEOSCIENCES, 2014, 7 (01) : 193 - 202