Experimental study on shear transfer across interfaces with post-installed shear reinforcement

被引:0
|
作者
Nie, Xin [1 ]
Huang, Da [1 ]
Liu, Tai [1 ]
Fan, Jiansheng [1 ]
机构
[1] Tsinghua Univ, Dept Civil Engn, Key Lab Civil Engn Safety & Durabil, China Educ Minist, Beijing 100084, Peoples R China
来源
JOURNAL OF BUILDING ENGINEERING | 2024年 / 97卷
基金
中国国家自然科学基金;
关键词
Precast flooring system; Fit-up issue; Post-installed rebar; Concrete-to-concrete interface; Shear transfer mechanism; CONSTRUCTION; BEHAVIOR;
D O I
10.1016/j.jobe.2024.110812
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
To address the fit-up issues arising from reinforcement congestion and limited seating area over precast beams, an improved joint detail characterized by post-installed interface shear reinforcement has been developed. The incorporation of post-installed narrower looped bars as an alternative to conventional protruding stirrups significantly expedites the erection of precast flooring systems. Moreover, direct shear tests are performed on 30 Z-shaped specimens to investigate the influence of joint details, surface roughness, looped bar ratio, and embedment length of post-installed bars on the interface shear behavior. Experimental results indicate that employing post-installed narrower looped bars not only ensures adequate seating length for precast flooring systems, but also prevents the splitting failure of concrete cover which can induce the degradation of dowel action. Sufficient anchorage is the prerequisite for post-installed looped bars to impose clamping stress on concrete interface, and a shallow embedment length may trigger the occurrence of pull-out failure. Surface roughness is another factor determining the interface shear resistance and stiffness. Untreated surfaces, in contrast to intentionally roughened surfaces, are susceptible to the cohesion fracture and may hinder the development of shear-friction action. Furthermore, a linear correlation exists between looped bar ratio and the shear resistance of concrete interface. Based on the experimental results, design recommendations, including the minimum required anchorage length for post-installed looped bars, are proposed for the novel joint detail.
引用
收藏
页数:22
相关论文
共 50 条
  • [1] Shear strength of an anchor post-installed into a hardened concrete member
    Foraboschi, Paolo
    ENGINEERING STRUCTURES, 2024, 302
  • [2] Post-installed anchors in concrete strengthened by post-installed reinforcement under tensile load
    Siamakani, Seyed Yaser Mousavi
    Sahamitmongkol, Raktipong
    EUROPEAN JOURNAL OF ENVIRONMENTAL AND CIVIL ENGINEERING, 2022, 26 (13) : 6563 - 6582
  • [3] Experimental evaluation of flat slabs strengthened with post-installed shear bolts with pre-loading
    Bolesova, Maria
    Gajdosova, Katarina
    ENGINEERING STRUCTURES, 2023, 293
  • [4] Experimental and numerical study into the punching shear strengthening of RC flat slabs using post-installed steel bolts
    Saleh, Haifa
    Kalfat, Robin
    Abdouka, Kamiran
    Al-Mahaidi, Riadh
    CONSTRUCTION AND BUILDING MATERIALS, 2018, 188 : 28 - 39
  • [5] Shear strength of post-installed connectors in thin UHPC precast walls
    Prejs, Andy
    Jawdhari, Akram
    Fam, Amir
    STRUCTURES, 2023, 48 : 492 - 510
  • [6] Ultimate Shear Force of an Any Anchor Group Post-Installed into Concrete
    Foraboschi, Paolo
    MATERIALS, 2023, 16 (07)
  • [7] Tensile and shear capacity of post-installed chemical adhesive anchors in lightweight concrete
    Du, Hongkai
    Wang, Haimeng
    Wang, Jinyu
    Wang, Yuandong
    Yang, Fuxiong
    STRUCTURES, 2024, 61
  • [8] Modeling and analysis of the shear capacity of adhesive anchors post-installed into uncracked concrete
    Gesoglu, Mehmet
    Guneyisi, Esra Mete
    Guneyisi, Erhan
    Yilmaz, Muhammet Enes
    Mermerdas, Kasim
    COMPOSITES PART B-ENGINEERING, 2014, 60 : 716 - 724
  • [9] Post-installed shear connectors: Fatigue push-out tests of coiled spring pins
    Hallmark, Robert
    Collin, Peter
    Hicks, Stephen J.
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2019, 153 (298-309) : 298 - 309
  • [10] Experimental Study on the Fire Endurance of Post-installed Rebar Connection System
    Yu, Jiangtao
    Xu, Wanli
    Liu, Changqing
    RESPONSE OF STRUCTURES UNDER EXTREME LOADING, 2015, : 924 - 931