A Predictive Model for Software Cost Estimation Using ARIMA Algorithm

被引:0
作者
Draz, Moatasem M. [1 ]
Emam, Osama [2 ]
Azzam, Safaa M. [2 ]
机构
[1] Kafrelsheikh Univ, Fac Comp & Informat, Dept Software Engn, Kafrelsheikh, Egypt
[2] Helwan Univ, Fac Comp & Artificial Intelligence, Dept Informat Syst, Helwan, Egypt
关键词
Software cost estimation; software effort estimation; promise repository; SCE; ARIMA;
D O I
10.14569/IJACSA.2024.0150764
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Technology is a differentiator in business today. It plays a different and decisive role by providing programs that contribute to this. To build this software while avoiding risks during the implementation and construction process, it is necessary to estimate the cost. The cost estimation process is the process of estimating the effort, time, and resources needed to build a software project. It is a crucial process as it provides good planning during the construction and implementation process and reduces the risks you may be exposed to. Therefore, previous studies sought to build models and methods to estimate this, but they were not accurate enough to complete the process. Therefore, this study seeks to build a model using the Autoregressive integrated moving average (ARIMA) algorithm. Five datasets the COCOMO81, COCOMONasaV1, COCOMONasaV2, Desharnais, and China were used. The dataset was processed to remove noise and missing values, visualized to understand it, and linked using a time series to predict the future values of the data. It will then be trained on the ARIMA algorithm. To ensure the effectiveness and efficiency of the model for use, four famous evaluation criteria were used: mean magnitude of relative error (MMRE), root mean square error (RMSE), mean magnitude of relative error (MdMRE), and prediction accuracy (PRED). This experiment showed impressive software cost estimation results, with MMRE, RMSE, MdMRE, and PRED results being 0.07613, 0.04999, 0.03813, and 95% for the COCOMO81 dataset, respectively. The results were high for the COCOMONasaV1 dataset, reaching 0.02227, 0.02899, 0.01113, and 97.1%. The COCOMONasaV2 results were 0.01035, 0.00650, 0.00517, and 99.35%, respectively. The China dataset showed good prediction results of 0.00001, 0.00430, 0.00008, and 99.57%, respectively. The results were impressive and promising for the Desharnais dataset, showing 0.00004, 0.0039, 0.00002, and 99.6%. The results of this study are promising and distinctive compared to recent studies, and they also contribute to good business planning and risk reduction.
引用
收藏
页码:656 / 665
页数:10
相关论文
共 34 条
  • [1] Artificial intelligence and machine learning overview in pathology & laboratory medicine: A general review of data preprocessing and basic supervised concepts
    Albahra, Samer
    Gorbett, Tom
    Robertson, Scott
    D'Aleo, Giana
    Ockunzzi, Samuel
    Lallo, Daniel
    Hu, Bo
    Rashidi, Hooman H.
    [J]. SEMINARS IN DIAGNOSTIC PATHOLOGY, 2023, 40 (02) : 71 - 87
  • [2] Azzam S., 2024, FCI-H Inform. Bull., DOI [10.21608/fcihib.2024.261210.1104, DOI 10.21608/FCIHIB.2024.261210.1104]
  • [3] Using tabu search to configure support vector regression for effort estimation
    Corazza, A.
    Di Martino, S.
    Ferrucci, F.
    Gravino, C.
    Sarro, F.
    Mendes, E.
    [J]. EMPIRICAL SOFTWARE ENGINEERING, 2013, 18 (03) : 506 - 546
  • [4] Software cost estimation predication using a convolutional neural network and particle swarm optimization algorithm
    Draz, Moatasem. M.
    Emam, Osama
    Azzam, Safaa. M.
    [J]. SCIENTIFIC REPORTS, 2024, 14 (01):
  • [5] Does data splitting improve prediction?
    Faraway, Julian J.
    [J]. STATISTICS AND COMPUTING, 2016, 26 (1-2) : 49 - 60
  • [6] Forecasting of demand using ARIMA model
    Fattah, Jamal
    Ezzine, Latifa
    Aman, Zineb
    El Moussami, Haj
    Lachhab, Abdeslam
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 2018, 10
  • [7] An artificial neural network (ANN) approach for early cost estimation of concrete bridge systems in developing countries: the case of Sri Lanka
    Fernando, Nirodha
    Dilshan, Kasun T. A.
    Zhang, Hexin
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2024, 29 (01) : 23 - 51
  • [8] Ghafory Hamayoon, 2020, Int. J. Adv. Acad. Stud, V2, P511
  • [9] Google Colab, About us
  • [10] Hazari Animesh, 2024, Research Methodology for Allied Health Professionals: A comprehensive guide to Thesis & Dissertation, P79