The assignment of project managers to projects in an uncertain dynamic environment

被引:0
作者
Rezaeian, Aidin [1 ]
Koosha, Hamidreza [1 ]
Ranjbar, Mohammad [1 ]
Poormoaied, Saeed [2 ]
机构
[1] Ferdowsi Univ Mashhad, Dept Ind Engn, Mashhad, Iran
[2] Eindhoven Univ Technol, Dept Ind Engn & Innovat Sci, Eindhoven, Netherlands
关键词
Project management; Stochastic generalized assignment problem; Multi-stage stochastic programming; Stochastic dynamic programming; Heuristic algorithm; SELECTION; MODEL;
D O I
10.1007/s10479-024-05958-x
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we consider a project-based organization that deals with an assignment problem in which a set of projects must be assigned to a group of project managers. This assignment is done based on the relative contributions of projects to the organizational mission and a matching score between each pair of a project and a project manager. We assume that some projects are deterministic, and the organization has signed their corresponding contracts while others are stochastic, i.e. the organization has submitted bids for these projects and may or may not win them in the future. Furthermore, we consider a finite planning horizon and presume a predetermined start time for each deterministic and stochastic project. We develop two models including a multi-stage stochastic integer programming model and a stochastic dynamic programming model to solve the problem. The latter shows better performance for small-size and less complex instances whereas the former gives better performance for more complex instances. We also developed a heuristic algorithm to solve large-size and more complex instances. Computational results indicate that the developed heuristic algorithm can reach near-optimal solutions in reasonable CPU run times and dominates the two other solution approaches particularly for large-size instances.
引用
收藏
页码:1107 / 1134
页数:28
相关论文
共 30 条
  • [1] Exact solutions to a class of stochastic generalized assignment problems
    Albareda-Sambola, Maria
    van der Vlerk, Maarten H.
    Fernandez, Elena
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 173 (02) : 465 - 487
  • [2] [Anonymous], 2021, A guide to the project management body of knowledge (PMBOK guide), V7th
  • [3] [Anonymous], 2015, ICB: IPMA Competence Baseline, V4th
  • [4] Decision process of allocating projects to project managers
    Batista de Oliveira, Elaine Cristina
    Alencar, Luciana Hazin
    Cabral Seixas Costa, Ana Paula
    [J]. PRODUCTION PLANNING & CONTROL, 2018, 29 (08) : 645 - 654
  • [5] Model Predictive Control for Stochastic Resource Allocation
    Castanon, David A.
    Wohletz, Jerry M.
    [J]. IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 2009, 54 (08) : 1739 - 1750
  • [6] Crawford L., 2006, Project Management Journal, V37, P38
  • [7] DVIR D., 2006, PROJ MANAG J, V37, P36, DOI DOI 10.1177/875697280603700505
  • [8] Managing multiple engineering projects in a manufacturing support environment
    Fricke, SE
    Shenhar, AJ
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2000, 47 (02) : 258 - 268
  • [9] A decision-making support system module for project manager selection according to past performance
    Hadad, Yossi
    Keren, Baruch
    Laslo, Zohar
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (04) : 532 - 541
  • [10] Hauschildt J., 2000, Project Management Journal, V31, P23, DOI [10.1177/875697280003100304, DOI 10.1177/875697280003100304]