共 50 条
- [21] Middle and Long-Term Runoff Probabilistic Forecasting Based on Gaussian Mixture Regression Water Resources Management, 2019, 33 : 1785 - 1799
- [29] Probabilistic forecasting of the disturbance storm time index: An autoregressive Gaussian process approach SPACE WEATHER-THE INTERNATIONAL JOURNAL OF RESEARCH AND APPLICATIONS, 2017, 15 (08): : 1004 - 1019
- [30] Peak Load Forecasting of Electricity Generating Authority of Thailand by Gaussian Process 2014 INTERNATIONAL ELECTRICAL ENGINEERING CONGRESS (IEECON), 2014,