Comprehensive risk assessment of Pakistan railway network: A semi-quantitative risk matrix approach

被引:1
|
作者
Khan, Sadiq [1 ]
Pervez, Amjad [1 ]
Zhang, Yinggui [1 ]
Ahmad, Suleman [1 ]
Sharifzada, Hijratullah [2 ]
Ismail, Emad A. A. [3 ]
Awwad, Fuad A. [3 ]
机构
[1] Cent South Univ, Sch Traff & Transportat Engn, Changsha 410075, Peoples R China
[2] Cent South Univ, Sch Civil Engn, Changsha 410075, Peoples R China
[3] King Saud Univ, Coll Business Adm, Dept Quantitat Anal, POB 71115, Riyadh 11587, Saudi Arabia
基金
中国国家自然科学基金;
关键词
Risk assessment; Risk matrix approach; Safety management; Accident data; Pakistan Railway; TRAIN COLLISION RISK; TRANSPORTATION; IDENTIFICATION; FRAMEWORK; EVENTS; SAFETY;
D O I
10.1016/j.heliyon.2024.e32682
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Pakistan Railway (PR) is vital to the country's transportation infrastructure, facilitating passenger and freight transportation. However, the growing number of accidents associated with PR has raised concerns about its overall safety. In addition, there have been limited research efforts to investigate PR accidents and their underlying causes The present study conducts a comprehensive risk assessment and safety management of PR using a semi-quantitative risk matrix approach. The study combines historical accident data and expert evaluations to assess the likelihood and consequences of different railway accident types and potential contributing factors. The descriptive statistics analysis has revealed varying degrees of severity for different types of railway accidents in Pakistan. For instance, accidents like passenger and goods train derailments and collisions at unmanned level crossings were identified as extreme and intolerable, whereas train fire accidents were categorized as high and undesirable. Moreover, accidents attributed to human error are classified as extreme and intolerable, while those caused by negligence of road users and track defects are classified as high and undesirable. The study utilized the risk matrix approach and identified critical risk areas that can help the decision-makers prioritize effective risk mitigation strategies. In light of the present study's findings, policy implications, such as investment in infrastructure to mitigate risks associated with aging or deteriorating tracks, bridges, and tunnels, and human resource development for railway personnel to improve their skills, decisionmaking abilities, and awareness of safety protocols, are recommended.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] A semi-quantitative coal burst risk classification system
    Onur Vardar
    Chengguo Zhang
    Ismet Canbulat
    Bruce Hebblewhite
    InternationalJournalofMiningScienceandTechnology, 2018, 28 (05) : 721 - 727
  • [22] Dynamic Semi-Quantitative Risk Research in Chemical Plants
    Song, Qiusheng
    Jiang, Peng
    Zheng, Song
    Kong, Yaguang
    Zhao, Ye
    Shen, Gang
    PROCESSES, 2019, 7 (11)
  • [23] Quantitative and semi-quantitative risk assessment of occupational exposure to lead among electrical solderers in Neyshabur, Iran
    Mahmoud Mohammadyan
    Mahmood Moosazadeh
    Narges Khanjani
    Somayeh Rahimi Moghadam
    Environmental Science and Pollution Research, 2019, 26 : 31207 - 31214
  • [24] Quantitative and semi-quantitative risk assessment of occupational exposure to lead among electrical solderers in Neyshabur, Iran
    Mohammadyan, Mahmoud
    Moosazadeh, Mahmood
    Khanjani, Narges
    Moghadam, Somayeh Rahimi
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2019, 26 (30) : 31207 - 31214
  • [25] Determination of Hazard in Captive Hotel Laundry Using Semi Quantitative Risk Assessment Matrix
    Jusoh, Zuraini
    Shattar, Noristisarah Abd
    Majid, Hayati Adilin Mohd Abd
    Adenan, Nur Dalila
    ASEAN-TURKEY ASLI QOL2015: AICQOL2015, 2016, 222 : 915 - 922
  • [26] Semi-quantitative risk analysis of a normally unmanned installation facility
    Anggraini Ratih Kumaraningrum
    Ajang Indra
    Dwini Normayulisa Putri
    Azmi Mohd Shariff
    Heri Hermansyah
    Journal of Petroleum Exploration and Production Technology, 2019, 9 : 3135 - 3147
  • [27] Semi-quantitative risk analysis of a normally unmanned installation facility
    Kumaraningrum, Anggraini Ratih
    Indra, Ajang
    Putri, Dwini Normayulisa
    Shariff, Azmi Mohd
    Hermansyah, Heri
    JOURNAL OF PETROLEUM EXPLORATION AND PRODUCTION TECHNOLOGY, 2019, 9 (04) : 3135 - 3147
  • [28] Semi-quantitative risk assessment of adjacent track accidents on shared-use rail corridors
    Lin, Chen-Yu
    Saat, M. Rapik
    Barkan, Christopher P. L.
    JOURNAL OF RAIL TRANSPORT PLANNING & MANAGEMENT, 2022, 24
  • [29] Methodology for semi-quantitative chemical risk assessments in healthcare facilities
    Berrube, Adele
    Mosqueron, Luc
    Cavereau, Dorothee
    Gangneux, Jean-Pierre
    Thomas, Olivier
    ENVIRONNEMENT RISQUES & SANTE, 2013, 12 (06): : 508 - 520
  • [30] Risk management for mine closure: A cloud model and hybrid semi-quantitative decision method
    Cui, Chao-qun
    Wang, Bing
    Zhao, Yi-xin
    Zhang, Yong-Jin
    Xue, Li-ming
    INTERNATIONAL JOURNAL OF MINERALS METALLURGY AND MATERIALS, 2020, 27 (08) : 1021 - 1035