Parametric Study on Blind Bolted Rectangular CFST to Steel Beam Connection Including Combined Stiffeners

被引:0
作者
Bennoui, Imed [1 ]
Rouaz, Idriss [1 ]
Rafa, Sid Ali [1 ]
Bentafat, Rachid [1 ]
机构
[1] Natl Ctr Studies & Integrated Res Bldg Engn CNERI, Algiers, Algeria
来源
PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON BEHAVIOUR OF STEEL STRUCTURES IN SEISMIC AREAS, VOL 2, STESSA 2024 | 2024年 / 520卷
关键词
Concrete-filled steel tubes (CFST); Numerical modelling; Blind bolted connection; Parametric study; Cyclic behavior; CYCLIC BEHAVIOR; PERFORMANCE;
D O I
10.1007/978-3-031-62888-7_9
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This article presents a parametric analysis on blind bolted connections between rectangular concrete-filled steel tube (CFST) columns and steel beams including combined stiffeners. Numerical studies involved using a three-dimensional (3D) non-linear finite element model (FEM) of the connections subjected to cyclic loading. The proposed FEM's accuracy is validated against experimental data from previously tested novel connections. Key parameters such as the yield strength of the end-plate and beam flange as well as the compressive strength of the concrete core were investigated. Findings emphasized the influence of these parameters on the cyclic behavior and energy dissipation, in achieving satisfactory ductility. The study also examined seismic properties of the joint with combined stiffeners, evaluating stiffness and strength degradation, showing promising seismic performance of the proposed connection.
引用
收藏
页码:97 / 107
页数:11
相关论文
共 50 条
[31]   Seismic behavior of a novel steel-encased beam-end connection (SEBC) between precast RC beam-CFST column for simple on-site assembly [J].
Feng, Liyu ;
Wang, Xuanding ;
Liao, Yue ;
Liu, Jiepeng ;
Zhou, Xuhong ;
Chen, Xiaohu ;
Chung, Kwok-Fai .
JOURNAL OF BUILDING ENGINEERING, 2024, 88
[32]   Post-fire seismic performance of concrete-filled steel tubular column to steel beam joints with blind-bolted connections: Experiment and simulation [J].
Han, Lin-Hai ;
Song, Tian-Yi ;
Li, Shuai .
ENGINEERING STRUCTURES, 2023, 283
[33]   Experimental study on demountable and reusable steel beam-to-column joints with bolted-pinned connections [J].
Yang, Lu ;
Peng, Lei ;
Ban, Huiyong .
JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2024, 214
[34]   Experimental study and numerical simulation analysis of the Bolted-Welded hybrid connection joint of steel frame under fire [J].
Fan, Shenggang ;
Duan, Shengjie ;
Zeng, Shaoru ;
Wu, Yiwen ;
Ding, Runmin .
STRUCTURES, 2022, 41 :77-98
[35]   Analytical investigation and parametric study on the fire behavior of glulam bolted beam-to-column connections based on the quasi-non-linear fracture mechanics model [J].
Luo, Jing ;
Li, Zheng ;
He, Minjuan ;
Gan, Zhaozhuo ;
Wang, Xijun .
FIRE SAFETY JOURNAL, 2022, 133
[36]   Experimental study on the seismic behaviour of the connection between concrete-filled twin steel tubes column and steel beam [J].
Zhang, Y. F. ;
Zhang, D. F. .
EUROPEAN JOURNAL OF ENVIRONMENTAL AND CIVIL ENGINEERING, 2015, 19 (03) :347-365
[37]   Behavior of the damage-tolerant beam-column connection for earthquake-resilient steel frame: Experimental and numerical study [J].
Liu, Ruyue ;
Zhu, Yunzhao ;
Yan, Guiyun ;
Zheng, Lianqiong ;
Wu, Jianbin ;
Lai, Qiulan .
STRUCTURES, 2024, 67
[38]   Bond-slip behavior of UHPC-filled CFST bridge column-beam socket connection: Experimental study and analytical model [J].
Su, Sibo ;
Zhang, Guangda ;
han, Qiang ;
Zhou, Daxing ;
Xu, Li ;
Liu, Peng ;
Du, Xiuli .
STRUCTURES, 2024, 63
[39]   Experimental Study of Low-Cycle Fatigue Behavior of a Welded Flange-Bolted Web Connection in Steel Moment-Resisting Frames [J].
Lee, Dong-Seok ;
Kishiki, Shoichi ;
Yamada, Satoshi ;
Ishida, Takanori ;
Jiao, Yu .
EARTHQUAKE SPECTRA, 2018, 34 (04) :1829-1846
[40]   Parametric study of hysteretic performance of high-strength steel framed-tube structures with web-bolted connected shear links [J].
Lian, Ming ;
Li, Wei ;
Cheng, Qianqian .
JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2022, 196