Bi-level task planning strategy for blended-wing-body underwater gliders

被引:1
作者
Liang, Qingwei [1 ]
Huang, Hancheng [1 ,2 ]
Zio, Enrico [2 ,3 ]
Hu, Shanshan [1 ]
Yang, Cheng [1 ]
机构
[1] Northwestern Polytech Univ, Sch Marine Sci & Technol, Xian 710072, Peoples R China
[2] Politecn Milan, Energy Dept, I-20133 Milan, Italy
[3] Mines Paris PSL Univ, Ctr Res Risk & Crises CRC, Paris, France
关键词
BWBUG; task planning; constraints; energy consumption; glide path; OPTIMIZATION; ALGORITHM;
D O I
10.1080/17445302.2024.2404072
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
This study focuses on the task planning problem of the blended-wing-body underwater glider (BWBUG), which must autonomously navigate through a sequence of underwater visitation points while ensuring safety and economy. Firstly, the task planning problem of the BWBUG is analysed, with attention given to operational space and task requirements. Subsequently, a bi-level planning framework that incorporates both the bottom-level and top-level planners is proposed. The bottom-level planner optimises the glide path between any two visit points by considering safety and glide angle constraints, with the objective of minimising energy usage. The top-level planner focuses on the task constraints and optimises the global visitation path of the BWBUG to achieve the objective of global energy minimisation. Simulations demonstrate the effectiveness of the bi-level based task planning strategy proposed in this study. The solution algorithms are highly competitive, capable of planning rational global visitation paths for the BWBUG.
引用
收藏
页数:16
相关论文
共 50 条
[31]   Bi-Level Programming for the Energy Retrofit Planning of Street Lighting Systems [J].
Carli, Raffaele ;
Dotoli, Mariagrazia .
PROCEEDINGS OF THE 2017 IEEE 14TH INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC 2017), 2017, :543-548
[32]   A Bi-level Electricity Flow Planning Model for New Power System [J].
Sun, Yiding ;
Sun, Ke ;
Han, Xiaonan ;
Zhang, Kexin ;
Lin, Wei ;
Sun, Yingyun .
2022 5TH INTERNATIONAL CONFERENCE ON RENEWABLE ENERGY AND POWER ENGINEERING, REPE, 2022, :386-391
[33]   Planning Regional Water Resources System Using an Interval Fuzzy Bi-Level Programming Method [J].
Lv, Y. ;
Huang, G. H. ;
Li, Y. P. ;
Yang, Z. F. ;
Liu, Y. ;
Cheng, G. H. .
JOURNAL OF ENVIRONMENTAL INFORMATICS, 2010, 16 (02) :43-56
[34]   Actuator energy and drag minimization of a blended-wing-body with variable-camber continuous trailing-edge flaps [J].
Zhao, Wei ;
Kapania, Rakesh K. .
ENGINEERING OPTIMIZATION, 2020, 52 (09) :1561-1587
[35]   Multistage Cooperative Trajectory Planning for Multimissile Formation via Bi-Level Sequential Convex Programming [J].
Liu, Chaoyue ;
Zhang, Cheng ;
Xiong, Fenfen .
IEEE ACCESS, 2020, 8 :22834-22853
[36]   Bi-Level Model Management Strategy for Solving Expensive Multi-Objective Optimization Problems [J].
Li, Fei ;
Yang, Yujie ;
Liu, Yuhao ;
Liu, Yuanchao ;
Qian, Muyun .
IEEE TRANSACTIONS ON EMERGING TOPICS IN COMPUTATIONAL INTELLIGENCE, 2025, 9 (01) :332-346
[37]   A bi-level planning strategy of a hydrogen-supercapacitor hybrid energy storage system based on APA-MOHHO [J].
Lu, Xinyu ;
Du, Banghua ;
Zhu, Wenchao ;
Yang, Yang ;
Xie, Changjun ;
Zhao, Bo ;
Zhang, Leiqi .
IET RENEWABLE POWER GENERATION, 2024, 18 (07) :1072-1090
[38]   Observer-based incremental backstepping sliding-mode fault-tolerant control for blended-wing-body aircrafts [J].
Liu, Shi Qian ;
Whidborne, James F. .
NEUROCOMPUTING, 2021, 464 :546-561
[39]   A Bi-Level Model for Planning Signalized and Uninterrupted Flow Intersections in an Evacuation Network [J].
Liu, Yue ;
Luo, Zhenke .
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2012, 27 (10) :731-747
[40]   A bi-level planning approach of logistics unmanned aerial vehicle route network [J].
Li, Shan ;
Zhang, Honghai ;
Yi, Jia ;
Liu, Hao .
AEROSPACE SCIENCE AND TECHNOLOGY, 2023, 141