Job-Shop Scheduling with Robot Synchronization for Transport Operations

被引:0
作者
Gayon, Jean Philippe [1 ]
Lacomme, Philippe [1 ]
Oussama, Amine [1 ]
机构
[1] Univ Clermont Auvergne, LIMOS, Clermont Auvergne INP, CNRS,Mines St Etienne, F-63000 Clermont Ferrand, France
来源
METAHEURISTICS, MIC 2024, PT I | 2024年 / 14753卷
关键词
Job shop; Synchronization; Scheduling; Transportation; Disjunctive graph; Meta-heuristic; Mixed integer linear programming; MACHINES; ALGORITHM;
D O I
10.1007/978-3-031-62912-9_5
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
We consider a Job Shop Scheduling Problem with transport (JSPT) which consists in jointly scheduling machines and robots. In contrast with the literature, we assume that a transport operation may involve several robots simultaneously, which requires resource synchronization over time. We formulate this problem as a Mixed Integer Linear Programming (MILP) formulation. Then we propose a GRASP-ELS meta-heuristic and a local search procedure where we use a Bierwith's sequence approach to evaluate a solution. In a numerical study, we have adapted instances from the literature to our problem. The meta-heuristic competes with the exact resolution providing high quality solution in reduced computation time, which lead us to consider that both the modeling and local search are accurate.
引用
收藏
页码:28 / 42
页数:15
相关论文
共 15 条
[1]  
BIERWIRTH C, 1995, OR SPEKTRUM, V17, P87, DOI 10.1007/BF01719250
[2]   A time window approach to simultaneous scheduling of machines and material handling system in an FMS [J].
Bilge, U ;
Ulusoy, G .
OPERATIONS RESEARCH, 1995, 43 (06) :1058-1070
[3]   Synchronization in Vehicle Routing-A Survey of VRPs with Multiple Synchronization Constraints [J].
Drexl, Michael .
TRANSPORTATION SCIENCE, 2012, 46 (03) :297-316
[4]   Tabu search algorithms for job-shop problems with a single transport robot [J].
Hurink, J ;
Knust, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 162 (01) :99-111
[5]   A tabu search algorithm for scheduling a single robot in a job-shop environment [J].
Hurink, J ;
Knust, S .
DISCRETE APPLIED MATHEMATICS, 2002, 119 (1-2) :181-203
[6]   Makespan minimization for flow-shop problems with transportation times and a single robot [J].
Hurink, J ;
Knust, S .
DISCRETE APPLIED MATHEMATICS, 2001, 112 (1-3) :199-216
[7]   Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles [J].
Lacomme, Philippe ;
Larabi, Mohand ;
Tchernev, Nikolay .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 143 (01) :24-34
[8]  
Lawrence S., 1984, Resource Constrained Project Scheduling: An Experimental Investigation of Heuristic Scheduling Techniques
[9]  
MecaBotiX, 2023, About us
[10]  
Pinedo ML, 2012, SCHEDULING: THEORY, ALGORITHMS, AND SYSTEMS, FOURTH EDITION, P1, DOI 10.1007/978-1-4614-2361-4