Multiobjective unrelated parallel machines scheduling problem with periodic maintenance activities and dependent processing times

被引:0
|
作者
Yaghtin, Mohammad [1 ]
Javid, Youness [1 ]
机构
[1] Kharazmi Univ, Fac Engn, Dept Ind Engn, Tehran, Iran
关键词
Parallel machine scheduling; Periodic maintenance activities; Multiobjective; NSGA-II; PREVENTIVE MAINTENANCE; GENETIC ALGORITHM; AVAILABILITY; OPTIMIZATION; JOBS; MINIMIZATION; RESOURCES; TARDINESS;
D O I
10.1108/JM2-09-2023-0198
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - The purpose of this research is to address the complex multiobjective unrelated parallel machine scheduling problem with real-world constraints, including sequence-dependent setup times and periodic machine maintenance. The primary goal is to minimize total tardiness, earliness and total completion times simultaneously. This study aims to provide effective solution methods, including a Mixed-Integer Programming (MIP) model, an Epsilon-constraint method and the Nondominated Sorting Genetic Algorithm (NSGA-II), to offer valuable insights into solving large-sized instances of this challenging problem. Design/methodology/approach - This study addresses a multiobjective unrelated parallel machine scheduling problem with sequence-dependent setup times and periodic machine maintenance activities. An MIP model is introduced to formulate the problem, and an Epsilon-constraint method is applied for a solution. To handle the NP-hard nature of the problem for larger instances, an NSGA-II is developed. The research involves the creation of 45 problem instances for computational experiments, which evaluate the performance of the algorithms in terms of proposed measures. Findings - The research findings demonstrate the effectiveness of the proposed solution approaches for the multiobjective unrelated parallel machine scheduling problem. Computational experiments on 45 generated problem instances reveal that the NSGA-II algorithm outperforms the Epsilon-constraint method, particularly for larger instances. The algorithms successfully minimize total tardiness, earliness and total completion times, showcasing their practical applicability and efficiency in handling real-world scheduling scenarios. Originality/value - This study contributes original value by addressing a complex multiobjective unrelated parallel machine scheduling problem with real-world constraints, including sequence-dependent setup times and periodic machine maintenance activities. The introduction of an MIP model, the application of the Epsilon-constraint method and the development of the NSGA-II algorithm offer innovative approaches to solving this NP-hard problem. The research provides valuable insights into efficient scheduling methods applicable in various industries, enhancing decision-making processes and operational efficiency.
引用
收藏
页码:477 / 494
页数:18
相关论文
共 50 条
  • [31] Algorithms for the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Times
    Silva, Luciano Geraldo
    Rego, Marcelo Ferreira
    de Assis, Luciana Pereira
    Andrade, Alessandro Vivas
    2018 37TH INTERNATIONAL CONFERENCE OF THE CHILEAN COMPUTER SCIENCE SOCIETY (SCCC), 2018,
  • [32] Scheduling jobs and maintenance activities on parallel machines
    Maher Rebai
    Imed Kacem
    Kondo H. Adjallah
    Operational Research, 2013, 13 : 363 - 383
  • [33] Scheduling jobs and maintenance activities on parallel machines
    Rebai, Maher
    Kacem, Imed
    Adjallah, Kondo H.
    OPERATIONAL RESEARCH, 2013, 13 (03) : 363 - 383
  • [34] Scheduling jobs and maintenance activities on parallel machines
    Lee, CY
    Chen, ZL
    NAVAL RESEARCH LOGISTICS, 2000, 47 (02) : 145 - 165
  • [35] A GRASP for a real-world scheduling problem with unrelated parallel print machines and sequence-dependent setup times
    Iori, Manuel
    Locatelli, Alberto
    Locatelli, Marco
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (21) : 7367 - 7385
  • [36] Makespan minimization for scheduling unrelated parallel machines with setup times
    Ying, Kuo-Ching
    Lee, Zne-Jung
    Lin, Shih-Wei
    JOURNAL OF INTELLIGENT MANUFACTURING, 2012, 23 (05) : 1795 - 1803
  • [37] Makespan minimization for scheduling unrelated parallel machines with setup times
    Kuo-Ching Ying
    Zne-Jung Lee
    Shih-Wei Lin
    Journal of Intelligent Manufacturing, 2012, 23 : 1795 - 1803
  • [38] Including preventive maintenance activities in an unrelated parallel machine environment with dependent setup times
    Avalos-Rosales, Oliver
    Angel-Bello, Francisco
    Alvarez, Ada
    Cardona-Valdes, Yajaira
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 123 : 364 - 377
  • [39] Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times
    Rubén Ruiz
    Carlos Andrés-Romano
    The International Journal of Advanced Manufacturing Technology, 2011, 57 : 777 - 794
  • [40] Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times
    Ruiz, Ruben
    Andres-Romano, Carlos
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 57 (5-8): : 777 - 794