共 44 条
Techno-economic integrated multi-criteria analysis of wind to hydrogen systems: A comprehensive parametric study
被引:1
作者:
Dehshiri, Seyyed Shahabaddin Hosseini
[1
]
Dehshiri, Seyyed Jalaladdin Hosseini
[2
]
Mostafaeipour, Ali
[3
,4
]
Le, Ttu
[3
,4
]
机构:
[1] Sharif Univ Technol, Dept Mech Engn, Tehran, Iran
[2] Allameh Tabatabai Univ, Fac Management & Accounting, Dept Ind Management, Tehran, Iran
[3] Duy Tan Univ, Inst Res & Dev, Da Nang, Vietnam
[4] Duy Tan Univ, Sch Engn & Technol, Da Nang, Vietnam
关键词:
Renewable energy;
Wind energy;
Weibull probability distribution function;
Hydrogen production;
Multi-criteria decision-making;
POTENTIAL LOCATIONS;
ENERGY;
FEASIBILITY;
PROVINCE;
POWER;
PROJECTS;
CITY;
IRAN;
D O I:
10.1016/j.ijhydene.2024.09.185
中图分类号:
O64 [物理化学(理论化学)、化学物理学];
学科分类号:
070304 ;
081704 ;
摘要:
While Iran has notable renewable energy potentials, the renewable energy sector of this country has remained underdeveloped, mostly because of easy access to cheap fossil fuels. This paper discusses and analyzed the possibility for hydrogen generation from wind resource in urban city which is suffered from air pollution and is located in northwestern Iran. Wind energy and power density estimations were performed using the 2-parameter Weibull probability distribution function. These estimates were used to predict the power output, hydrogen output, economic viability, and environmental benefit of building a wind power-hydrogen production unit in one of several candidate sites in the studied area. Ultimately, the most suitable site for such a project was determined using the SWARA/WASPAS method. After investigating 16 different conventional wind turbines, the best one in terms of achievable power and hydrogen output and economic feasibility was determined. The results showed that Gamesa G80 with a capacity of 2 GW was the best wind turbine for the urban area. Gardaneh-Almas with a wind power density of 1252W/m(2) was identified as the best site for power generation in the region. Potential wind-powered hydrogen output at this site was estimated to 97 ton/yr. LCOE and LCOH for this site were estimated to 0.047 $/kWh and 4.6 $/kg-H-2, respectively.
引用
收藏
页码:477 / 487
页数:11
相关论文