Disputes in Renewable Energy Development: International and Domestic Interventions

被引:2
作者
Narayan, Padam [1 ]
Kar, Santu [2 ]
Jha, Kumar Neeraj [1 ]
机构
[1] Indian Inst Technol Delhi, Dept Civil Engn, New Delhi 110016, India
[2] Indian Inst Technol Guwahati, Dept Civil Engn, Gauhati 781039, Assam, India
关键词
National Solar Mission (NSM); World Trade Organization (WTO); Great Indian Bustard (GIB); Domestic Content Requirement (DCR); Dispute; Solar manufacturing;
D O I
10.1061/JLADAH.LADR-1128
中图分类号
D9 [法律]; DF [法律];
学科分类号
0301 ;
摘要
India's National Solar Mission (NSM) is one of the most extensive renewable energy programs worldwide. The program underlays various short-term to long-term goals targeting the country's growing needs and commitment to climate change control. However, the actual progress lags behind the growth estimations. Similar to other power resources, disputes in the renewable sector are inevitable. The study explored two such dispute cases, including international and domestic interventions, which impacted the sector's growth trajectory. The study explored disputes' explicit and implied impact on capacity deployment and determined their long-term consequences. The study identified that the international interventions in the World Trade Organization (WTO) trade dispute case diminished the domestic solar manufacturing potential, induced import dependency, and hindered domestic policy and plans. The nonself-reliance is susceptible to supply chain disruptions, geopolitics, nonavailability of spares and services, and unilateral price changes. On the other hand, the domestic interventions in the Great Indian Bustard (GIB) habitat encroachment dispute case resulted in an additional financial burden on the project developers beyond the agreed tariff and the stranding of large capacity solar and wind projects for a long time. These impacts could be the genesis of other potential disputes and conflicts. Furthermore, the study proposes alternate measures that would support dispute avoidance while securing the rights of both parties in dispute.
引用
收藏
页数:10
相关论文
共 78 条
[1]  
Aggarwal M., A Long Road to 2030 for India's Import-heavy Solar Power Sector, (2021)
[2]  
Bown C.P., Participation in WTO dispute settlement: Complainants, interested parties, and free riders, World Bank Econ. Rev., 19, 2, pp. 287-310, (2005)
[3]  
Bown C.P., Self-enforcing Trade: Developing Countries and WTO Dispute Settlement, (2009)
[4]  
Growth of Electricity Sector in India from 1947-2020, (2020)
[5]  
Brief Status of Awarded Ultra-mega Power Projects (UMPP), (2021)
[6]  
Review of Progress of Hydropower Projects under Execution in the country-104 Quarterly Review (Jan-Mar 2021), (2021)
[7]  
Review of Progress of Thermal Power Projects under Execution in the country-174th Quarterly Review (Jan-March 2021), (2021)
[8]  
Executive Summary on Power Sector-March 2023, (2023)
[9]  
The Electricity Act 2003, (2003)
[10]  
Electricity Consumption and Development Indicators, (2016)