Owner capabilities in project organizing: Managing disruptions on infrastructure projects

被引:0
作者
Shenoy, Dinesh [1 ]
Mahanty, Biswajit [2 ]
机构
[1] FLAME Univ, Operat Management, Pune, India
[2] Indian Inst Technol, Ind & Syst Engn, Kharagpur, India
来源
PROJECT LEADERSHIP AND SOCIETY | 2024年 / 5卷
关键词
Megaproject; Owner capabilities; Urban development; Disruptions; MANAGEMENT;
D O I
10.1016/j.plas.2024.100124
中图分类号
F [经济];
学科分类号
02 ;
摘要
Megaprojects are large-scale, complex initiatives that often encounter major disruptions during their life cycle. These disruptions have the potential to seriously impair the viability of the megaprojects. They may also cause severe damage to the economy in the region where they are emerging. To overcome disruptions, and to enhance their delivery performance, the strategic management concept of dynamic capabilities is being increasingly applied. In the context of megaproject owners, there is a need to understand what capabilities are required and how they are developed in the face of disruptions. Drawing upon longitudinal data over a period spanning 50 years for three megaprojects in the urban development (metro rail) domain, this study examines key disruptions that may influence the development of owner capabilities. Specifically, this study identifies four project capabilities: i) a strategic capability to continuously engage with, and manage external stakeholders, ii) a strategic capability to preserve value and transform the delivery process, iii) a governance capability to enhance organizational resilience, and iv) a commercial capability to manage knowledge and partnerships. Given that disruptions are repetitive in nature, owners would need these project capabilities to overcome disruptions.
引用
收藏
页数:16
相关论文
共 56 条
  • [1] The dynamic capabilities of public construction clients in the healthcare sector
    Adam, Abderisak
    Lindahl, Goran
    Leiringer, RoMe
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 13 (01) : 153 - 171
  • [2] [Anonymous], 2009, The Metro Railways (Amendment) Act
  • [3] [Anonymous], 2013, Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act
  • [4] [Anonymous], 1978, The Metro Railways Act
  • [5] Revisiting the project management knowledge framework: Rebalancing the framework to include transformation projects
    Cha, Jonghyuk
    Newman, Mike
    Winch, Graham
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2018, 11 (04) : 1026 - 1043
  • [6] Coombs W.T., 1995, MANAGEMENT, V8, P447, DOI DOI 10.1177/0893318995008004003
  • [7] Explicating the dynamics of project capabilities
    Davies, Andrew
    Brady, Tim
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (02) : 314 - 327
  • [8] What Are the Causes and Cures of Poor Megaproject Performance? A Systematic Literature Review and Research Agenda
    Denicol, Juliano
    Davies, Andrew
    Krystallis, Ilias
    [J]. PROJECT MANAGEMENT JOURNAL, 2020, 51 (03) : 328 - 345
  • [9] District Disaster Management Authority, 2011, Disaster Management Plan for Delhi Metro Stations
  • [10] Theory building from cases: Opportunities and challenges
    Eisenhardt, Kathleen M.
    Graebner, Melissa E.
    [J]. ACADEMY OF MANAGEMENT JOURNAL, 2007, 50 (01) : 25 - 32