A two-stage distributed stochastic planning method for source-grid-load-storage flexibility resources considering flexible ramp capacity

被引:1
作者
Wang, Jinpeng [1 ,2 ]
Zeng, Pingliang [2 ]
Yin, Lulu [3 ]
Dong, Yanfei [1 ]
Liu, Xiaofang [1 ]
Yang, Ruopu [2 ]
机构
[1] Henan Univ Urban Construct, Sch Elect & Control Engn, Pingdingshan, Peoples R China
[2] Hangzhou Dianzi Univ, Dept Automat, Hangzhou, Peoples R China
[3] Pinggao Grp CO LTD, Pingdingshan, Peoples R China
基金
中国国家自然科学基金;
关键词
Flexibility resource planning; Stochastic planning; Second order cone; Benders decomposition; ENERGY-STORAGE; TEST SYSTEM; ELECTRICITY; MODEL;
D O I
10.1016/j.ijepes.2024.110134
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
With rapidly increasing levels of renewable energy penetration, flexibility resources play an ever more critical role in the future power system. This paper describes a two-stage stochastic mixed integer second order cone (MISOC) method for flexibility resource planning (VFRP) considering source-grid-load-storage interactions. Considering renewable energy penetration levels and flexibility resource characteristics, this study quantifies the extent to which the share of renewable energy generation affects cost performance, and assesses the priority and potential of investing in flexibility resources. Moreover, the multi-type flexibility resource portfolio allocation method and energy storage only approach are compared in terms of socio-economic benefits. A multi-cut Benders-based approach is used for decomposing large-scale stochastic expansion planning problems to reduce the computational burden. Numerical simulation tests on the modified energy test systems I39G20 and F213G20 verified the correctness and effectiveness of the proposed flexible resource planning models and solution algorithms. The simulation results show that retrofit of coal-fired units for better flexibility has a higher investment return. Still, energy storage presents a tremendous investment prospect and potential. Finally, the multi-type flexibility resource portfolio allocation method is more cost-effective than an energy storage only approach.
引用
收藏
页数:17
相关论文
共 41 条
[1]   Mapping demand flexibility: A spatio-temporal assessment of flexibility needs, opportunities and response potential [J].
Agbonaye, Osaru ;
Keatley, Patrick ;
Huang, Ye ;
Ademulegun, Oluwasola O. ;
Hewitt, Neil .
APPLIED ENERGY, 2021, 295
[2]  
[Anonymous], 2016, Investment in Electricity Generation and
[3]  
[Anonymous], 2018, Power system flexibility for the energy transition: part 1, Overview for policy makers
[4]   Power system flexibility: A review [J].
Babatunde, O. M. ;
Munda, J. L. ;
Hamam, Y. .
ENERGY REPORTS, 2020, 6 :101-106
[5]  
Conejo A.J., 2006, Decomposition techniques in mathematical programming: engineering and science applications
[6]  
Council of European Energy Regulators-Distribution Systems Working Group, 2018, Flexibility Use at Distribution Level - A CEER Conclusions Paper'
[7]   Comprehensive classifications and characterizations of power system flexibility resources [J].
Degefa, Merkebu Zenebe ;
Sperstad, Iver Bakken ;
Saele, Hanne .
ELECTRIC POWER SYSTEMS RESEARCH, 2021, 194
[8]   Managing electric flexibility from Distributed Energy Resources: A review of incentives for market design [J].
Eid, Cherrelle ;
Codani, Paul ;
Perez, Yannick ;
Reneses, Javier ;
Hakvoort, Ruth .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2016, 64 :237-247
[9]   Convex Model for Controlled Islanding in Transmission Expansion Planning to Improve Frequency Stability [J].
Esmaili, Masoud ;
Ghamsari-Yazdel, Mohammad ;
Amjady, Nima ;
Chung, C. Y. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2021, 36 (01) :58-67
[10]  
Gou J, 2020, IOP Conf Ser Earth Environ Sci, V467