A Fuzzy Inference System-Based Hybrid Assignment Method for Cobot Assignment Problem

被引:0
|
作者
Kimapom, Marrisa [1 ]
Nunkaew, Wuttinan [1 ]
机构
[1] Thammasat Univ, Dept Ind Engn, Fac Engn, Thammasat Sch Engn TSE, Pathum Thani, Thailand
关键词
cobot assignment problem; fuzzy inference system; Mamdani-type inference; preemptive goal programming; ALLOCATION;
D O I
10.1109/ISSE61612.2024.10601201
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
To address the complexity of a cobot assignment problem in smart manufacturing, this research has pioneered a new hybrid assignment method integrating the fuzzy inference system (FIS) into both multi-objective assignment and linear assignment models. It focuses on the critical tasks of assigning robots, jobs, and workers to create efficient cobot workstations, covering three core activities: robot-to-job, job-to-robot, and worker-to-robot-job assignments. An FIS-based multi-objective assignment model is utilized in the initial step to form effective sets of a single robot and jobs. The model also allows users to adjust the level of negative deviation from the target to enhance the satisfaction of the decision-maker. In the final step, workers are assigned and the cobot workstations are concurrently created using a FIS-based linear assignment model. To illustrate the method's efficacy, we provided a practical example that demonstrates its performance in action for industrial applications.
引用
收藏
页码:292 / 296
页数:5
相关论文
共 50 条
  • [11] Fuzzy Approach for Assignment Problem
    Yaakob, Shamshul Bahar
    Watada, Junzo
    2009 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, 2009, : 1408 - 1413
  • [12] The assignment problem with fuzzy weights
    Takahashi, MT
    Yamakami, A
    NAFIPS 2004: ANNUAL MEETING OF THE NORTH AMERICAN FUZZY INFORMATION PROCESSING SOCIETY, VOLS 1AND 2: FUZZY SETS IN THE HEART OF THE CANADIAN ROCKIES, 2004, : 903 - 906
  • [13] Role assignment strategy for heterogeneous robots based on fuzzy evaluation and fuzzy inference
    Miao, Kehua
    Li, MaoQing
    2006 9TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION, ROBOTICS AND VISION, VOLS 1- 5, 2006, : 2235 - +
  • [14] A novel fuzzy inference method for urban incomplete road weight assignment
    Wang, Longhao
    Rui, Xiaoping
    GEO-SPATIAL INFORMATION SCIENCE, 2024, 27 (06) : 2008 - 2022
  • [15] A novel fuzzy inference method for urban incomplete road weight assignment
    Wang, Longhao
    Rui, Xiaoping
    GEO-SPATIAL INFORMATION SCIENCE, 2024, 27 (06) : 2008 - 2022
  • [16] A hybrid algorithm for the assignment problem
    Xu, HB
    Wang, HJ
    Li, CG
    2002 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-4, PROCEEDINGS, 2002, : 881 - 884
  • [17] Solving assignment problem based on a hybrid ant algorithm
    Xu Chaoren
    Li Yongmei
    ICCSE'2006: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE & EDUCATION: ADVANCED COMPUTER TECHNOLOGY, NEW EDUCATION, 2006, : 84 - 86
  • [18] A labeling algorithm for the fuzzy assignment problem
    Lin, CJ
    Wen, UP
    FUZZY SETS AND SYSTEMS, 2004, 142 (03) : 373 - 391
  • [19] A fuzzy approach for the reviewer assignment problem
    Daş, G. Sena
    Göçken, Tolunay
    Computers and Industrial Engineering, 2014, 72 (01): : 50 - 57
  • [20] A fuzzy approach for the reviewer assignment problem
    Das, G. Sena
    Gocken, Tolunay
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 72 : 50 - 57