Integrated Application of Dynamic Risk-Based Inspection and Integrity Operating Windows in Petrochemical Plants

被引:1
作者
Han, Zhiyuan [1 ,2 ]
Liu, Juanbo [1 ,2 ]
Li, Jun [1 ,2 ]
Kang, Haoyuan [1 ,2 ]
Xie, Guoshan [1 ,2 ]
机构
[1] China Special Equipment Inspect & Res Inst, Beijing 100029, Peoples R China
[2] Technol Innovat Ctr Risk Prevent & Control Refinin, Beijing 101300, Peoples R China
关键词
integrity management; dynamic risk-based inspection (DRBI); integrity operating windows (IOWs); crude distillation unit; industrial application; MAINTENANCE; SYSTEM; RBM;
D O I
10.3390/pr12071509
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The scientific and reasonable maintenance strategy is critical to ensure the continuous operation of stationary equipment in the petrochemical industry; both risk-based inspection (RBI) and integrity operating windows (IOWs) are effective for stationary equipment maintenance. In traditional static RBI, the risk is assumed to remain constant in whole inspection period, and the latest variations of medium and process parameters are not fed back into risk calculation. Thus, risk value may be overestimated or underestimated, leading to unexpected failures or excessive inspection. Integrated application of dynamic risk-based inspection (DRBI) and IOWs is an advanced direction for this problem. However, due to the complexity of dynamic interaction mechanisms and risk assessment algorithms as well as the deficiency of powerful software, industrial applications of DRBI and IOWs are still limited. By proposing improved dynamic risk indexes and real-time monitoring process parameters as well as utilizing them in DRBI assessment, this article proposes an integrated DRBI-IOWs method and develops a corresponding system. Further, the method and system are applied in a crude distillation unit. The results show that DRBI-IOWs provide direct and real-time insights into the actual risk and give early warning to the process parameter controls, which is important to control the equipment risk of sudden failures.
引用
收藏
页数:16
相关论文
共 50 条
[41]   Modeling of risk-based inspection, maintenance and life-cycle cost with partially observable Markov decision processes [J].
Corotis, Ross B. ;
Ellis, J. Hugh ;
Jiang, Mingxiang .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2005, 1 (01) :75-84
[42]   Quantification of the value of condition monitoring system with time-varying monitoring performance in the context of risk-based inspection [J].
Zhang, Wei-Heng ;
Qin, Jianjun ;
Lu, Da-Gang ;
Liu, Min ;
Faber, Michael H. .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 231
[43]   Realising advanced risk-based port state control inspection using data-driven Bayesian networks [J].
Yang, Zhisen ;
Yang, Zaili ;
Yin, Jingbo .
TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2018, 110 :38-56
[44]   Risk-based integrated performance assessment framework for public-private partnership infrastructure projects [J].
Fatima, Anam ;
Mubin, Sajjad ;
Masood, Rehan .
ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2024, 16 (01) :251-274
[45]   A Recent Review of Risk-Based Inspection Development to Support Service Excellence in the Oil and Gas Industry: An Artificial Intelligence Perspective [J].
Aditiyawarman, Taufik ;
Kaban, Agus Paul Setiawan ;
Soedarsono, Johny Wahyuadi .
ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART B-MECHANICAL ENGINEERING, 2023, 9 (01)
[46]   Dynamic risk-based process design and operational optimization via multi-parametric programming [J].
Ali, Moustafa ;
Cai, Xiaoqing ;
Khan, Faisal I. ;
Pistikopoulos, Efstratios N. ;
Tian, Yuhe .
DIGITAL CHEMICAL ENGINEERING, 2023, 7
[47]   Determining the Optimal Maintenance Strategy for Ammonium Hydroxide Production Unit Using Risk-Based Inspection and Analytic Hierarchy Process [J].
Ghasemi, R. ;
Azimi, Y. ;
Ghasemi, Z. .
INTERNATIONAL JOURNAL OF ENGINEERING, 2021, 34 (09) :2087-2096
[48]   Dynamic methods for ongoing assessment of site-level risk in risk-based monitoring of clinical trials: A scoping review [J].
Cragg, William J. ;
Hurley, Caroline ;
Yorke-Edwards, Victoria ;
Stenning, Sally P. .
CLINICAL TRIALS, 2021, 18 (02) :245-259
[49]   Methods and tools to support real time risk-based flood forecasting - a UK pilot application [J].
Brown, Emma ;
Bachmann, Daniel ;
Cranston, Michael ;
de Leeuw, Annemargreet ;
Boelee, Leonore ;
Diermanse, Ferdinand ;
Eilander, Dirk ;
de Bruijn, Karin ;
Weerts, Albrecht ;
Hazlewood, Caroline ;
Beckers, Joost .
3RD EUROPEAN CONFERENCE ON FLOOD RISK MANAGEMENT (FLOODRISK 2016), 2016, 7
[50]   Application of genetic algorithm to risk-based maintenance operations of liquefied natural gas carrier systems [J].
Nwaoha, T. C. ;
Yang, Z. ;
Wang, J. ;
Bonsall, S. .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART E-JOURNAL OF PROCESS MECHANICAL ENGINEERING, 2011, 225 (E1) :40-52