Integrated Application of Dynamic Risk-Based Inspection and Integrity Operating Windows in Petrochemical Plants

被引:1
作者
Han, Zhiyuan [1 ,2 ]
Liu, Juanbo [1 ,2 ]
Li, Jun [1 ,2 ]
Kang, Haoyuan [1 ,2 ]
Xie, Guoshan [1 ,2 ]
机构
[1] China Special Equipment Inspect & Res Inst, Beijing 100029, Peoples R China
[2] Technol Innovat Ctr Risk Prevent & Control Refinin, Beijing 101300, Peoples R China
关键词
integrity management; dynamic risk-based inspection (DRBI); integrity operating windows (IOWs); crude distillation unit; industrial application; MAINTENANCE; SYSTEM; RBM;
D O I
10.3390/pr12071509
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The scientific and reasonable maintenance strategy is critical to ensure the continuous operation of stationary equipment in the petrochemical industry; both risk-based inspection (RBI) and integrity operating windows (IOWs) are effective for stationary equipment maintenance. In traditional static RBI, the risk is assumed to remain constant in whole inspection period, and the latest variations of medium and process parameters are not fed back into risk calculation. Thus, risk value may be overestimated or underestimated, leading to unexpected failures or excessive inspection. Integrated application of dynamic risk-based inspection (DRBI) and IOWs is an advanced direction for this problem. However, due to the complexity of dynamic interaction mechanisms and risk assessment algorithms as well as the deficiency of powerful software, industrial applications of DRBI and IOWs are still limited. By proposing improved dynamic risk indexes and real-time monitoring process parameters as well as utilizing them in DRBI assessment, this article proposes an integrated DRBI-IOWs method and develops a corresponding system. Further, the method and system are applied in a crude distillation unit. The results show that DRBI-IOWs provide direct and real-time insights into the actual risk and give early warning to the process parameter controls, which is important to control the equipment risk of sudden failures.
引用
收藏
页数:16
相关论文
共 50 条
[31]   A holistic approach to risk-based decision on inspection and design of fatigue-sensitive structures [J].
Zou, Guang ;
Faber, Michael Havbro ;
Gonzalez, Arturo ;
Banisoleiman, Kian .
ENGINEERING STRUCTURES, 2020, 221
[32]   Risk-Based Prioritization of Sewer Pipe Inspection from Infrastructure Asset Management Perspective [J].
Lee, Jeonghun ;
Park, Chan Young ;
Baek, Seungwon ;
Han, Seung H. ;
Yun, Sungmin .
SUSTAINABILITY, 2021, 13 (13)
[33]   Defect Trends in Fire Alarm Systems: A Basis for Risk-Based Inspection (RBI) Approaches [J].
Veit, Stefan ;
Steiner, Frantisek .
SAFETY, 2024, 10 (04)
[34]   A risk-based approach to inspection planning for pipelines considering the coupling effect of corrosion and dents [J].
Huang, Yunfei ;
Qin, Guojin ;
Yang, Ming .
PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2023, 180 :588-600
[35]   Fuzzy dynamic risk-based maintenance investment optimization for offshore process facilities [J].
Yazdi, Mohammad ;
Nedjati, Arman ;
Abbassi, Rouzbeh .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2019, 57 :194-207
[36]   Estimation of Shutdown Schedule to Remove Fouling Layers of Heat Exchangers Using Risk-Based Inspection (RBI) [J].
Elwerfalli, Abdelnaser ;
Alsadaie, Salih ;
Mujtaba, Iqbal M. .
PROCESSES, 2021, 9 (12)
[37]   A risk-based fuzzy arithmetic model to determine safety integrity levels considering individual and societal risks [J].
Cheraghi, Morteza ;
Reniers, Genserik ;
Baladeh, Aliakbar Eslami ;
Khakzad, Nima ;
Taghipour, Sharareh .
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2024, 40 (04) :1992-2018
[38]   Risk-Based Clustering for Near Misses Identification in Integrated Deterministic and Probabilistic Safety Analysis [J].
Di Maio, Francesco ;
Vagnoli, Matteo ;
Zio, Enrico .
SCIENCE AND TECHNOLOGY OF NUCLEAR INSTALLATIONS, 2015, 2015
[39]   Uncertainty Analysis of Interdependencies in Dynamic Infrastructure Recovery: Applications in Risk-Based Decision Making [J].
Barker, Kash ;
Haimes, Yacov Y. .
JOURNAL OF INFRASTRUCTURE SYSTEMS, 2009, 15 (04) :394-405
[40]   Quantifying uncertainties for Risk-Based Inspection planning using in-service Hull Structure Monitoring of FPSO hulls [J].
Hageman, R. B. ;
van der Meulen, F. H. ;
Rouhan, A. ;
Kaminski, M. L. .
MARINE STRUCTURES, 2022, 81