Integrated Application of Dynamic Risk-Based Inspection and Integrity Operating Windows in Petrochemical Plants

被引:1
作者
Han, Zhiyuan [1 ,2 ]
Liu, Juanbo [1 ,2 ]
Li, Jun [1 ,2 ]
Kang, Haoyuan [1 ,2 ]
Xie, Guoshan [1 ,2 ]
机构
[1] China Special Equipment Inspect & Res Inst, Beijing 100029, Peoples R China
[2] Technol Innovat Ctr Risk Prevent & Control Refinin, Beijing 101300, Peoples R China
关键词
integrity management; dynamic risk-based inspection (DRBI); integrity operating windows (IOWs); crude distillation unit; industrial application; MAINTENANCE; SYSTEM; RBM;
D O I
10.3390/pr12071509
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The scientific and reasonable maintenance strategy is critical to ensure the continuous operation of stationary equipment in the petrochemical industry; both risk-based inspection (RBI) and integrity operating windows (IOWs) are effective for stationary equipment maintenance. In traditional static RBI, the risk is assumed to remain constant in whole inspection period, and the latest variations of medium and process parameters are not fed back into risk calculation. Thus, risk value may be overestimated or underestimated, leading to unexpected failures or excessive inspection. Integrated application of dynamic risk-based inspection (DRBI) and IOWs is an advanced direction for this problem. However, due to the complexity of dynamic interaction mechanisms and risk assessment algorithms as well as the deficiency of powerful software, industrial applications of DRBI and IOWs are still limited. By proposing improved dynamic risk indexes and real-time monitoring process parameters as well as utilizing them in DRBI assessment, this article proposes an integrated DRBI-IOWs method and develops a corresponding system. Further, the method and system are applied in a crude distillation unit. The results show that DRBI-IOWs provide direct and real-time insights into the actual risk and give early warning to the process parameter controls, which is important to control the equipment risk of sudden failures.
引用
收藏
页数:16
相关论文
共 50 条
[21]   Risk-Based Planning of Diagnostic Testing of Turbines Operating with Increased Flexibility [J].
Tomala, Martyna ;
Rusin, Andrzej ;
Wojaczek, Adam .
ENERGIES, 2020, 13 (13)
[22]   A decision support system to assess the operational safety and economic benefits of risk-based inspection implementation strategies [J].
Oropallo, Eugenio ;
Piscopo, Paolo ;
Centobelli, Piera ;
Cerchione, Roberto ;
Nuevo, Eduardo ;
Rodriguez-Prieto, Alvaro .
SAFETY SCIENCE, 2024, 177
[23]   A bi-objective mathematical model to determine risk-based inspection programs [J].
Javid, Y. .
PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2021, 146 :893-904
[24]   Application of Markovian Processes for the Risk-Based Decision Making [J].
Palacio, Johana ;
Patino, Carmen ;
Carazas, Fernando ;
Souza, Gilberto .
CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, :1279-+
[25]   Cost-effective risk-based inspection planning for offshore wind farms [J].
Papatzimos, A. Koltsidopoulos ;
Dawood, T. ;
Thies, P. R. .
INSIGHT, 2018, 60 (06) :299-305
[26]   Risk-based maintenance (RBM): a quantitative approach for maintenance/inspection scheduling and planning [J].
Khan, FI ;
Haddara, MA .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2003, 16 (06) :561-573
[27]   Implementing Risk-Based Inspection Approach: Is it Beneficial for Pressure Equipment in Malaysia Industries? [J].
Mohamed, Ramuna ;
Hassan, Che Rosmani Che ;
Hamid, Mahar Diana .
PROCESS SAFETY PROGRESS, 2018, 37 (02) :194-204
[28]   A risk-based shutdown inspection and maintenance interval estimation considering human error [J].
Hameed, Abdul ;
Khan, Faisal ;
Ahmed, Salim .
PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2016, 100 :9-21
[29]   Risk-Based Dynamic Identity Authentication Method Based on the UCON Model [J].
Liu, Jing ;
Liu, Rongchao ;
Lai, Yingxu .
SECURITY AND COMMUNICATION NETWORKS, 2022, 2022
[30]   Comparison of API 510 pressure vessels inspection planning with API 581 risk-based inspection planning approaches [J].
Shishesaz, Mohammad Reza ;
Bajestani, Mohammad Nazamezhad ;
Hashemi, Seyed Javad ;
Shekari, Elahe .
INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 2013, 111 :202-208