The solution of bi-criteria flow shop scheduling problem through mathematical modelling and its application in a shoe factory

被引:0
作者
Celik, Ayse [1 ]
Kaya, Serkan [1 ]
机构
[1] Harran Univ, Engn Fac, Dept Ind Engn, TR-63300 Sanliurfa, Turkiye
关键词
flow shop scheduling; FSS; 0-1 integer goal programming model; shoe manufacturing; makespan; total tardiness; TT; CUCKOO SEARCH ALGORITHM; PERMUTATION FLOWSHOP; MEMETIC ALGORITHM; TOTAL TARDINESS; OPTIMIZATION; MINIMIZATION;
D O I
10.1504/EJIE.2024.140751
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses a problem occurring in a real-life shoe manufacturing factory consisting of 28 machines. Due to a large number of orders, frequent and long delays in the delivery of the products to customers occur, which costs the factory a significant amount. The problem is formulated as a flow shop scheduling (FSS) problem and a 0-1 integer goal programming model is developed. Computational experiments indicate that problems with up to 50 jobs can be solved within a reasonable time by the developed model. A comparison of the results with the actual case in the factory revealed that, on the average, an improvement of 72.0% in total tardiness (TT) was achieved while an improvement of 3.9% was achieved in the maximum completion time. This helped to save the factory significantly. [Received: 30 January 2023; Accepted: 1 June 2023]
引用
收藏
页码:772 / 790
页数:20
相关论文
共 71 条
  • [1] A Local Search-Based Generalized Normal Distribution Algorithm for Permutation Flow Shop Scheduling
    Abdel-Basset, Mohamed
    Mohamed, Reda
    Abouhawwash, Mohamed
    Chang, Victor
    Askar, S. S.
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (11):
  • [2] Aheleroff Shohin, 2020, Procedia CIRP, P1, DOI 10.1016/j.procir.2020.04.023
  • [3] A review of scheduling research involving setup considerations
    Allahverdi, A
    Gupta, JND
    Aldowaisan, T
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02): : 219 - 239
  • [4] An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time
    Allahverdi, Ali
    Aydilek, Harun
    Aydilek, Asiye
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2022, 13 (01) : 43 - 50
  • [5] No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
    Allahverdi, Ali
    Aydilek, Harun
    Aydilek, Asiye
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 269 (02) : 590 - 601
  • [7] A parallel hybrid PSO-GA algorithm for the flexible flow-shop scheduling with transportation
    Amirteimoori, Arash
    Mahdavi, Iraj
    Solimanpur, Maghsud
    Ali, Sadia Samar
    Tirkolaee, Erfan Babaee
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 173
  • [8] Amrouche K, 2020, EUR J IND ENG, V14, P573
  • [9] Learning dependent job scheduling in mass customized scenarios considering ergonomic factors
    Anzanello, Michel J.
    Fogliatto, Flavio S.
    Santos, Luana
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 154 : 136 - 145
  • [10] Population-based Tabu search with evolutionary strategies for permutation flow shop scheduling problems under effects of position-dependent learning and linear deterioration
    Arik, Oguzhan Ahmet
    [J]. SOFT COMPUTING, 2021, 25 (02) : 1501 - 1518