Robust optimization algorithm for integrated crane assignment and scheduling in slab yard with uncertain arrival time

被引:3
作者
Wang, Xu [1 ,2 ]
Zhao, Qiuhong [3 ,4 ]
Liu, Shixin [5 ]
Wang, Jia [6 ]
Qi, Liang [7 ]
机构
[1] Shenyang Univ Chem Technol, Sch Comp Sci & Technol, Shenyang, Peoples R China
[2] Hebei Univ Environm Engn, Sch Econ & Management, Qinhuangdao, Peoples R China
[3] Beihang Univ, Sch Econ & Management, Beijing, Peoples R China
[4] Beihang Univ, MoE Key Lab Complex Syst Anal & Management Decis, Beijing, Peoples R China
[5] Northeast Univ, Coll Informat Sci Engn, Shenyang, Peoples R China
[6] Shenyang Univ Technol, Sch Management, Shenyang, Peoples R China
[7] Shandong Univ Sci & Technol, Coll Comp Sci & Engn, Qingdao, Peoples R China
基金
中国国家自然科学基金;
关键词
Slab yard; integrated crane assignment and scheduling; improved column and cut generation method; robustness; ALLOCATION;
D O I
10.1080/00207543.2024.2388836
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A slab yard served as a key component of the iron and steel plant. Effective slab yard crane assignment and scheduling directly affect the overall efficiency of the steel production process. This work addresses an uncertain slab yard crane assignment and scheduling problem (SYCAS) with the fluctuating arrival time. A stochastic programming model is established to obtain a robust solution that minimises the completion time of slab groups under uncertainty. Due to its NP-hardness, we developed an improved column and cut generation method (IC&CG), which divides the problem into a relaxed master problem (RMP) and a slave problem (SP). A new initialisation strategy for obtaining high-quality solutions and an acceleration strategy for discarding irrelevant scenarios are proposed. We use small-size instances to compare the performance of IC&CG with CPLEX and a generalised column and cut generation method in both deterministic and uncertain environments to validate the effectiveness of the method. For large-size instances, a lower bound (LB) of the optimal objective function is proposed to show the effectiveness of IC&CG. Furthermore, we prove the robustness of the method by sensitive analysis.
引用
收藏
页码:1707 / 1724
页数:18
相关论文
共 43 条
  • [1] Robust Optimization for a Maritime Inventory Routing Problem
    Agra, Agostinho
    Christiansen, Marielle
    Hvattum, Lars Magnus
    Rodrigues, Filipe
    [J]. TRANSPORTATION SCIENCE, 2018, 52 (03) : 509 - 525
  • [2] Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: A robust exact decomposition
    Chargui, Kaoutar
    Zouadi, Tarik
    Sreedharan, V. Raja
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2023, 156
  • [3] Deployment and retrofit strategy for rubber-tyred gantry cranes considering carbon emissions
    Ding, Yi
    Yang, Yang
    Heilig, Leonard
    Lalla-Ruiz, Eduardo
    Voss, Stefan
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 161
  • [4] Measuring the capacity utilization of the 48 largest iron and steel enterprises in China
    Fukuyama, Hirofumi
    Liu, Hui-hui
    Song, Yao-yao
    Yang, Guo-liang
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 288 (02) : 648 - 665
  • [5] Integrated optimisation of storage and pre-marshalling moves in a slab warehouse
    Ge, Peixin
    Zhao, Ren
    Sun, Defeng
    Dong, Yun
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (06) : 2021 - 2043
  • [6] Scheduling Twin Yard Cranes in a Container Block
    Gharehgozli, Amir Hossein
    Laporte, Gilbert
    Yu, Yugang
    de Koster, Rene
    [J]. TRANSPORTATION SCIENCE, 2015, 49 (03) : 686 - 705
  • [7] An exact method for scheduling a yard crane
    Gharehgozli, Amir Hossein
    Yu, Yugang
    de Koster, Rene
    Udding, Jan Tijmen
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 235 (02) : 431 - 447
  • [8] Gantry crane scheduling in intermodal rail-road container terminals
    Guo, Peng
    Cheng, Wenming
    Wang, Yi
    Boysen, Nils
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (16) : 5419 - 5436
  • [9] Dynamic yard crane dispatching in container terminals with predicted vehicle arrival information
    Guo, Xi
    Huang, Shell Ying
    Hsu, Wen Jing
    Low, Malcolm Yoke Hean
    [J]. ADVANCED ENGINEERING INFORMATICS, 2011, 25 (03) : 472 - 484
  • [10] The robust cyclic job shop problem
    Hamaz, Idir
    Houssin, Laurent
    Cafieri, Sonia
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 312 (03) : 855 - 865