A Calculation Method for Reliability Index of a Deep-Bedded Karst Tunnel Construction with Cavity Located Ahead of Tunnel Working Face
被引:1
|
作者:
Wu, Bo
论文数: 0引用数: 0
h-index: 0
机构:
Guangxi Univ, Sch Civil Engn & Architecture, Nanning 530004, Peoples R China
East China Univ Technol, Sch Civil & Architecture Engn, Nanchang 330013, Peoples R China
Guangzhou City Construct Coll, Sch Architectural Engn, Guangzhou 510925, Peoples R ChinaGuangxi Univ, Sch Civil Engn & Architecture, Nanning 530004, Peoples R China
Wu, Bo
[1
,2
,3
]
Sun, Wentao
论文数: 0引用数: 0
h-index: 0
机构:
Guangxi Univ, Sch Civil Engn & Architecture, Nanning 530004, Peoples R ChinaGuangxi Univ, Sch Civil Engn & Architecture, Nanning 530004, Peoples R China
Sun, Wentao
[1
]
Meng, Guowang
论文数: 0引用数: 0
h-index: 0
机构:
Guangxi Univ, Sch Civil Engn & Architecture, Nanning 530004, Peoples R China
Guangxi Univ, Key Lab Disaster Prevent & Struct Safety, Minist Educ, Nanning 530004, Peoples R ChinaGuangxi Univ, Sch Civil Engn & Architecture, Nanning 530004, Peoples R China
Meng, Guowang
[1
,4
]
机构:
[1] Guangxi Univ, Sch Civil Engn & Architecture, Nanning 530004, Peoples R China
[2] East China Univ Technol, Sch Civil & Architecture Engn, Nanchang 330013, Peoples R China
[3] Guangzhou City Construct Coll, Sch Architectural Engn, Guangzhou 510925, Peoples R China
[4] Guangxi Univ, Key Lab Disaster Prevent & Struct Safety, Minist Educ, Nanning 530004, Peoples R China
deeply buried karst tunnel;
tunnel building working face;
limit analysis;
instability probability;
reliability index;
RISK-ASSESSMENT;
WATER INRUSH;
MODEL;
FAILURE;
CAVE;
D O I:
10.3390/buildings14051349
中图分类号:
TU [建筑科学];
学科分类号:
0813 ;
摘要:
For the purpose of reliability quantitative assessment of the surrounding rock of the deeply embedded karst tunnel and the geological body around the cavern in the case of the cavern in the forepart of the tunnel face, on the basis of the upper bound limit analysis method, the energy dissipation theory, as well as the reliability theory, the dimensionless performance function of each damage area of the deeply buried karst tunnels could be established in the case of the cavern in the front of the tunnel face. Subsequently, the probability of failure and the reliability index of each damage region of the deep-bedded karst tunnel in the case of the cavern in the front of this tunnel face should be calculated through the Monte Carlo simulation sampling approach. The investigation has demonstrated that the larger the cohesion of the geotechnical body and the larger the internal friction angle within the geotechnical body, the larger the reliability indexes of the geotechnical bodies around the tunnel. The larger the diameter of the cavern and the larger the tunnel burial depth, the greater the probability of failure in the left part of the geotechnical body around this cavern, and the smaller the reliability indexes of these damage areas.