Project selection and scheduling with multiplicative enhancement effects and delay risk: An application in intelligent manufacturing technologies

被引:1
作者
Liu, Xiaohang [1 ]
Liang, Jingran [1 ]
Zhang, Zhi-hai [1 ]
Yang, Shun [2 ]
Peukert, Sina [2 ]
Lanza, Gisela [2 ]
机构
[1] Tsinghua Univ, Dept Ind Engn, Beijing, Peoples R China
[2] Karlsruhe Inst Technol KIT, Wbk Inst Prod Sci, Karlsruhe, Germany
基金
中国国家自然科学基金;
关键词
Project selection and scheduling; interdependent projects; multiplicative enhancement effects; delay risk; SHORTEST-PATH PROBLEM; RESOURCE-ALLOCATION; EXACT ALGORITHM; INDUSTRY; 4.0; IMPLEMENTATION; MODEL; INTERDEPENDENCIES; INVESTMENT; PORTFOLIOS; STRATEGY;
D O I
10.1080/24725854.2024.2374090
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the realm of intelligent manufacturing, driven by the push towards smart factories and Industry 4.0, optimizing technology selection and sequencing is paramount for intelligent transformation. This complex decision-making process resembles a novel project selection and scheduling problem, characterized by Multiplicative Enhancement Effects (MEEs) where the collective benefits of multiple projects can exceed their individual contributions. Additionally, the uncertain duration of projects further adds complexity. Motivated by these practical challenges, a stochastic mixed-integer programming model that incorporates MEEs and uncertain delays is established. A conditional value-at-risk-based risk measure is integrated to control delay risk. The solution approach leverages an efficient branch and bound-based approach with cutting strategies, integrating a sample average approximation framework and a backward labeling algorithm to handle stochastic elements. A real-world technology implementation case study highlights the advantages of considering MEEs, uncovers myopic biases in technology selection, and identifies implementation patterns centred around core Industry 4.0 technologies. This research enhances our understanding of intelligent manufacturing decision-making, offering valuable insights and practical implications for technology-driven transformations.
引用
收藏
页数:17
相关论文
共 54 条
  • [1] MODEL FOR SELECTION OF INTERDEPENDENT R AND D PROJECTS
    AAKER, DA
    TYEBJEE, TT
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1978, 25 (02) : 30 - 36
  • [2] Modeling and analyzing project interdependencies in project portfolios using an integrated social network analysis-fuzzy TOPSIS MICMAC approach
    Al Zaabi, Helal
    Bashir, Hamdi
    [J]. INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2020, 11 (06) : 1083 - 1106
  • [3] Solving a grey project selection scheduling using a simulated shuffled frog leaping algorithm
    Amirian, Homa
    Sahraeian, Rashed
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 107 : 141 - 149
  • [4] Industry 4.0 technologies assessment: A sustainability perspective
    Bai, Chunguang
    Dallasega, Patrick
    Orzes, Guido
    Sarkis, Joseph
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2020, 229
  • [5] Resource-Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations
    Ballestin, Francisco
    Leus, Roel
    [J]. PRODUCTION AND OPERATIONS MANAGEMENT, 2009, 18 (04) : 459 - 474
  • [6] Managing project interdependencies in IT/IS project portfolios: a review of managerial issues
    Bathallath, Sameer
    Smedberg, Asa
    Kjellin, Harald
    [J]. IJISPM-INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND PROJECT MANAGEMENT, 2016, 4 (01): : 67 - 82
  • [7] Industry 4.0 innovation ecosystems: An evolutionary perspective on value cocreation
    Benitez, Guilherme Brittes
    Ayala, Nestor Fabian
    Frank, Alejandro G.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2020, 228 (228)
  • [8] Birge JR, 2011, SPRINGER SER OPER RE, P3, DOI 10.1007/978-1-4614-0237-4
  • [9] Hybrid metaheuristics in combinatorial optimization: A survey
    Blum, Christian
    Puchinger, Jakob
    Raidl, Guenther R.
    Roli, Andrea
    [J]. APPLIED SOFT COMPUTING, 2011, 11 (06) : 4135 - 4151
  • [10] Accelerated label setting algorithms for the elementary resource constrained shortest path problem
    Boland, N
    Dethridge, J
    Dumitrescu, I
    [J]. OPERATIONS RESEARCH LETTERS, 2006, 34 (01) : 58 - 68