Managing Materials Vendor Risks for Improved Project Operational Performance: The Role of Risk-Oriented Culture

被引:0
作者
John, Nsikan [1 ]
Nwaguru, Peter [2 ]
Okon, Mercy G. D. [3 ]
Tommy, Uduak [4 ]
Bariate, Mba [5 ]
机构
[1] Covenant Univ, Ota, Nigeria
[2] European Global Sch Univ, Paris, France
[3] Univ Uyo, Uyo, Nigeria
[4] Univ Calabar, Calabar, Nigeria
[5] Garden City Premier Business Sch, Port Harcourt, Nigeria
来源
BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT | 2024年 / 21卷 / 02期
关键词
Vendor Risk Management; Construction Project Management; Construction Supply Chain; Sustainable Project Quality; Risk Culture; CONSTRUCTION; MANAGEMENT; PERSPECTIVE; CONTRACTORS;
D O I
10.14488/BJOPM.1957.2024
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Highlight: Sound risk management implementation is well noted for helping organisations to overcome operational inefficiencies. However, the management of risk associated with construction materials vendors, and how they impact project operational performance appear to have not been extensively researched. Goal: In this study, the effect of materials vendor risk management (vendor risk identification and vendor risk prevention) on project operational performance (project quality and scheduled completion time) was investigated. We also interrogate the mediating role of risk -oriented culture in the relationship between vendor risk management and operational performance. Design/Methodology/Approach: The target population was all 1,044 registered public construction firms under the Urban Regeneration Programme in Nigeria. The cross-sectional survey design was adopted, and random sampling was used to select 173 project managers, engineers, surveyors, vendors/contractors, and store representatives. Primary data was collected through the structured questionnaire, they were analysed via the Structural Equation Modelling (SEM) technique. Results: Three main conclusions are made about managing vendor risks: First, properly identified materials vendor risks (in terms of material handling issues, price escalation, non-compliance to specification, delivery delay, and sharp procurement practices) is positively related to operational performance. Second, implementing context -specific risk prevention measures (prior assessment score, vendor financial capacity, warranty policy, continuous monitoring, technical capacity) positively enhances operational outcomes. Third, paying attention to risk culture orientation of project stakeholders positively impact their risk prevention capability and operational performance of construction projects. Limitations : Study was limited to few operational performance indicators in project management. Future study could include other performance indicators. Practical Implications: The results can help project operations managers in industry address numerous risks associated with materials vendor. Originality/Values: The numerous abandoned and failed construction projects in developing countries as a result of less attention to vendor risks management prompted this study.
引用
收藏
页数:17
相关论文
共 72 条
  • [11] Al-Dalaeen A.S., 2022, INT J CONSTRUCTION S, V12, P1, DOI DOI 10.14424/IJCSCM120222-1-15
  • [12] The significant factors causing delay of building construction projects in Malaysia
    Alaghbari, Wa'el
    Kadir, Mohd. Razali A.
    Salim, Azizah
    Ernawati
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (02) : 192 - +
  • [13] Ali H.A. E.M., 2013, Journal of King Saud University - Engineering Sciences, V25, P125, DOI DOI 10.1016/J.JKSUES.2012.03.002
  • [14] Quantitative Analysis of Safety Risks and Relationship with Delayed Project Completion Times
    Alkaissy, Maryam
    Arashpour, Mehrdad
    Li, Heng
    Alaghmand, Sina
    Nezamian, Abe
    [J]. RISK ANALYSIS, 2022, 42 (03) : 580 - 591
  • [15] Amoah P., 2011, The Surveyor Journal, V4, P41
  • [16] Assaf A., 2016, International Journal of Project Management, V24, P349
  • [17] A review of risk management process in construction projects of developing countries
    Bahamid, R. A.
    Doh, S. I.
    [J]. GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271
  • [18] The Current Risk Management Practices and Knowledge in the Construction Industry
    Bahamid, Rami A.
    Doh, Shu Ing
    Khoiry, Muhamad Azry
    Kassem, Mukhtar A.
    Al-Sharafi, Mohammed A.
    [J]. BUILDINGS, 2022, 12 (07)
  • [19] Barber R.B., 2019, International Journal of Project Management, V23, P584
  • [20] Sustainable procurement in the public sector: an international comparative study
    Brammer, Stephen
    Walker, Helen
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2011, 31 (04) : 452 - 476