Managing Materials Vendor Risks for Improved Project Operational Performance: The Role of Risk-Oriented Culture

被引:0
作者
John, Nsikan [1 ]
Nwaguru, Peter [2 ]
Okon, Mercy G. D. [3 ]
Tommy, Uduak [4 ]
Bariate, Mba [5 ]
机构
[1] Covenant Univ, Ota, Nigeria
[2] European Global Sch Univ, Paris, France
[3] Univ Uyo, Uyo, Nigeria
[4] Univ Calabar, Calabar, Nigeria
[5] Garden City Premier Business Sch, Port Harcourt, Nigeria
来源
BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT | 2024年 / 21卷 / 02期
关键词
Vendor Risk Management; Construction Project Management; Construction Supply Chain; Sustainable Project Quality; Risk Culture; CONSTRUCTION; MANAGEMENT; PERSPECTIVE; CONTRACTORS;
D O I
10.14488/BJOPM.1957.2024
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Highlight: Sound risk management implementation is well noted for helping organisations to overcome operational inefficiencies. However, the management of risk associated with construction materials vendors, and how they impact project operational performance appear to have not been extensively researched. Goal: In this study, the effect of materials vendor risk management (vendor risk identification and vendor risk prevention) on project operational performance (project quality and scheduled completion time) was investigated. We also interrogate the mediating role of risk -oriented culture in the relationship between vendor risk management and operational performance. Design/Methodology/Approach: The target population was all 1,044 registered public construction firms under the Urban Regeneration Programme in Nigeria. The cross-sectional survey design was adopted, and random sampling was used to select 173 project managers, engineers, surveyors, vendors/contractors, and store representatives. Primary data was collected through the structured questionnaire, they were analysed via the Structural Equation Modelling (SEM) technique. Results: Three main conclusions are made about managing vendor risks: First, properly identified materials vendor risks (in terms of material handling issues, price escalation, non-compliance to specification, delivery delay, and sharp procurement practices) is positively related to operational performance. Second, implementing context -specific risk prevention measures (prior assessment score, vendor financial capacity, warranty policy, continuous monitoring, technical capacity) positively enhances operational outcomes. Third, paying attention to risk culture orientation of project stakeholders positively impact their risk prevention capability and operational performance of construction projects. Limitations : Study was limited to few operational performance indicators in project management. Future study could include other performance indicators. Practical Implications: The results can help project operations managers in industry address numerous risks associated with materials vendor. Originality/Values: The numerous abandoned and failed construction projects in developing countries as a result of less attention to vendor risks management prompted this study.
引用
收藏
页数:17
相关论文
共 72 条
  • [1] Assessment of critical risk and success factors in construction supply chain: a case of Pakistan
    Abas, Muhammad
    Khattak, Sikandar Bilal
    Habib, Tufail
    Nadir, Uroosa
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (12) : 2258 - 2266
  • [2] Abd Karim NA, 2012, 2012 IEEE COLLOQUIUM ON HUMANITIES, SCIENCE & ENGINEERING RESEARCH (CHUSER 2012)
  • [3] An Integrated Organisational Culture for Sustainable Environmental Performance in the Nigerian Context
    Adebayo, Olufunke P.
    Worlu, Rowland E.
    Moses, Chinonye L.
    Ogunnaike, Olaleke O.
    [J]. SUSTAINABILITY, 2020, 12 (20) : 1 - 15
  • [4] Adedugba A.T., 2022, Journal of Technological Advancements (JTA), V2, P1, DOI 10
  • [5] Supply Chain Risk Identification Using a HAZOP-Based Approach
    Adhitya, Arief
    Srinivasan, Rajagopalan
    Karimi, Iftekhar A.
    [J]. AICHE JOURNAL, 2009, 55 (06) : 1447 - 1463
  • [6] Aduma L.K., 2018, International Academic Journal of Information Sciences and Project Management, V3, P111
  • [7] USING MULTICRITERIA ANALYSIS AND FUZZY LOGIC FOR PROJECT PORTFOLIO MANAGEMENT
    Agapito, Andrezza de Oliveira
    Dianin Vianna, Marcilene de Fatima
    Moratori, Patrick B.
    Vianna, Dalessandro Soares
    Mitacc Meza, Edwin Benito
    Matias, Italo de Oliveira
    [J]. BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2019, 16 (02): : 347 - 357
  • [8] Ahmed S., 2019, Journal of Engineering, Construction and Architectural Management, V6, P225
  • [9] Ahmed S.M., 2012, Construction Delays in Florida: An Empirical Study", State of Florida
  • [10] Construction delays and their causative factors in Nigeria
    Aibinu, Ajibade Ayodeji
    Odeyinka, Henry Agboola
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (07) : 667 - 677