Performance of public sector joint venture construction projects in Zambia

被引:0
|
作者
Muleya, F. [1 ,2 ]
Kangombe, M. [2 ]
Tembo, C. K. [2 ]
Musonda, I. [1 ]
机构
[1] Univ Johannesburg, CARINBE, Johannesburg, South Africa
[2] Copperbelt Univ, Sch Built Environm, Kitwe, Zambia
关键词
Construction; joint venture; project performance; factors; SUCCESS;
D O I
10.1201/9781003325321-14
中图分类号
F0 [经济学]; F1 [世界各国经济概况、经济史、经济地理]; C [社会科学总论];
学科分类号
0201 ; 020105 ; 03 ; 0303 ;
摘要
Formation of Joint Ventures (JVs) among construction companies has in the recent past become one of the vehicles used to address project delivery challenges in the Zambian construction sector particularly on large complex projects. The aim of this study was to establish factors affecting project performance on public construction joint venture projects in Zambia. Due to the limited number of JV construction projects, purposive and snowball sampling techniques were used to select the sample size which constituted all 10 registered JV projects by the NCC. The study revealed that, payment delays by clients, suspension of works, lack of commitment, inadequate partner skills, poor communication, lack of cooperation, lack of trust and unfair JV agreement were found to be the major factors negatively affecting project performance on public JVs in the Zambian construction industry. The study recommends a deliberate platform that will formally derive benefits of JVs to stakeholders.
引用
收藏
页码:128 / 137
页数:10
相关论文
共 50 条
  • [1] Assessment of success factors for joint venture construction projects in Nigeria
    Famakin, I.
    Aje, I.
    Ogunsemi, D.
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2012, 17 (02) : 153 - +
  • [2] An evaluation of construction time performance of public sector civil engineering projects in Malaysia
    Othman, AA
    Torrance, JV
    Hamid, MA
    PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 381 - 388
  • [3] Assessment of Risk Management Maturity of Construction Organisations in Joint Venture Projects
    Abdulrahman R.S.
    Ibrahim A.D.
    Chindo P.G.
    Journal of Engineering, Project, and Production Management, 2019, 9 (01) : 20 - 28
  • [4] Exploring contextual issues impacting delivery and performance of public sector construction projects in Tanzania
    Abdallah, Abdullatif
    Doloi, Hemanta
    Holzer, Dominik
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2025,
  • [5] Governance of a public sector joint venture: the control challenges of dominated owners
    Holum, Marthe Liss
    LOCAL GOVERNMENT STUDIES, 2016, 42 (06) : 1004 - 1023
  • [6] Evaluation of risks affecting international construction joint venture (ICJV) projects in Ghana
    Akunyumu, Stephen
    Fugar, Frank
    Adinyira, Emmanuel
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2024, 22 (06) : 1797 - 1824
  • [7] Application of Delphi Expert Panel in Joint Venture Projects in Malaysian Construction Industry
    Adnan, Hamimah
    Supardi, Azizan
    Rashid, Zul Zakiyuddin Ahmad
    Yusuwan, Norazian Mohamad
    PROCEEDINGS OF THE 11TH EUROPEAN CONFERENCE ON RESEARCH METHODS, 2012, : 433 - 439
  • [8] PERFORMANCE MONITORING USING EVM INDICATOR: A STUDY CASE OF CONSTRUCTION PROJECTS IN THE PUBLIC SECTOR IN BRAZIL
    Netto, Joaquim Teixeira
    Quelhas, Osvaldo L. G.
    Franca, Sergio
    Meirino, Marcelo
    Lameira, Valdir
    SISTEMAS & GESTAO, 2015, 10 (01): : 194 - 202
  • [9] Causes of delays in Saudi Arabian public sector construction projects
    Al-Kharashi, Adel
    Skitmore, Martin
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (01) : 3 - 23
  • [10] Contributing Factors of Time Overrun in Public Sector Construction Projects
    Akhund, Muhammad Akram
    Imad, Hafiz Usama
    Memon, Nafees Ahmed
    Siddiqui, Fida Hussain
    Khoso, Ali Raza
    Panhwar, Abbas Ali
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2018, 8 (05) : 3369 - 3372