Examining the causes and effects of time overruns in construction projects promoted by rural municipalities in Nepal

被引:1
|
作者
Koirala, Madhav Prasad [1 ]
Shahi, Roshan Samrat [2 ]
机构
[1] Sch Engn Pokhara Univ, Sch Engn, Pokhara Metropolitan City 30, Gandaki Provenc, Nepal
[2] Pokhara Univ, Sch Engn, Pokhara, Nepal
关键词
Time overrun; Delay factors; Delay effects; National Competitive Bidding; DELAY;
D O I
10.1016/j.evalprogplan.2024.102436
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
Time overruns are the most common issue in construction projects, which have a significant negative impact on the project and the parties involved. This also applies to National Competitive Bidding (NCB) construction projects in municipalities, jeopardizing project timelines, costs, and quality standards. Poor performance by professionals in rural municipalities has resulted in inadequate infrastructure development in these areas. The goal of this study is to understand the causes and effects of time overruns by employing an exploratory and descriptive research methodology. The data from clients, consultants, and contractors consistently highlights key factors contributing to project delays, including adverse weather conditions, limited involvement from contractor head offices, insufficient consultant experience, inadequate site management, and delays in site mobilization. These delays incur substantial costs related to materials, land acquisition, labor, and market risks. The results included that 52.17% the projects experienced time overruns ranging from 24.4% to 514.71%. Furthermore, 21.73% of projects experienced cost overruns, with the highest at 19.92%. These findings provide critical insights for improving project management and addressing construction time overruns. It recommends conducting national-scale analyses to gain a comprehensive understanding of construction delays and to implement effective mitigation strategies.
引用
收藏
页数:13
相关论文
共 16 条
  • [1] Causes of time and cost overruns in construction projects: a scoping review
    Gomez-Cabrera, Adriana
    Gutierrez-Bucheli, Laura
    Munoz, Santiago
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (10) : 1107 - 1125
  • [2] Time overruns in the construction projects in Iraq: Case study on investigating and analyzing the root causes
    Al Kulabi, Ahmed Kamil
    Atiea, Huda M. Jawad
    OPEN ENGINEERING, 2022, 12 (01): : 702 - 715
  • [3] Assessing the causes of project overruns in tunnel construction projects in Pakistan
    Ayat, Muhammad
    Rehman, Hafeezur
    Qureshi, Sheheryar Mohsin
    Kang, Chang Wook
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (11) : 1856 - 1866
  • [4] Factors influencing Time and Cost Overruns on Freeform Construction Projects
    Kavuma, Andrew
    Ock, Jongho
    Jang, Hyounseung
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (04) : 1442 - 1450
  • [5] Investigation into the Causes of Delays and Cost Overruns in Uganda's Public Sector Construction Projects
    Alinaitwe, Henry
    Apolot, Ruth
    Tindiwensi, Dan
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2013, 18 (02) : 33 - 47
  • [6] Causes of Time Overrun in Construction of Building Projects in Pakistan
    Soomro, Faheem Ahmed
    Memon, Muhammed Jaffar
    Chandio, Abdul Fattah
    Sohu, Samiullah
    Soomro, Rizwanullah
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2019, 9 (01) : 3762 - 3764
  • [7] Causes, effects and solutions of delay and cost overruns in Iranian deep excavation projects
    Bayandor, Sara
    Kalatehjari, Roohollah
    Akherati, Reza
    Kasebzadeh, Jalal
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2025, 15 (02) : 309 - 336
  • [8] Modeling the Causes and Mitigation Measures for Cost Overruns in Building Construction: The Case of Higher Education Projects
    Alhammadi, Yasir
    Al-Mohammad, Mohammad S.
    Rahman, Rahimi A.
    BUILDINGS, 2024, 14 (02)
  • [9] Causes, Effects, and Mitigation Measures of Time and Cost Overruns in Water Supply Projects: Case of Tigrai Region, Northern Ethiopia
    Berihu, Lielti Gebreegziabher
    Grum, Berhane
    Tariku, Zeru
    Abebe, Bizuneh Asfaw
    ADVANCES IN CIVIL ENGINEERING, 2023, 2023
  • [10] Taxonomy for change causes and effects in construction projects
    Sun, Ming
    Meng, Xianhai
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (06) : 560 - 572