Optimal scheduling of a microgrid based on renewable resources and demand response program using stochastic and IGDT-based approach

被引:9
作者
Seyedeh-Barhagh, Sahar [1 ,2 ]
Abapour, Mehdi [1 ]
Mohammadi-Ivatloo, Behnam [1 ,3 ]
Shafie-Khah, Miadreza [2 ]
Laaksonen, Hannu [2 ]
机构
[1] Univ Tabriz, Fac Elect & Comp Engn, Tabriz, Iran
[2] Univ Vaasa, Sch Technol & Innovat, Vaasa, Finland
[3] LUT Univ, Sch Energy Syst, Dept Elect Engn, Lappeenranta, Finland
关键词
Optimal operation; Renewable generation; Microgrid; Demand response; Uncertainty management; Photovoltaic system; Electric vehicle; PARKING LOT; MANAGEMENT; ENERGY; OPERATION; VEHICLES; POWER;
D O I
10.1016/j.est.2024.111306
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Optimal economic scheduling of microgrids with photovoltaic (PV) and wind generation has gained increased attention during recent years. Integration of renewable energy resources in microgrids requires increasingly active control and management of energy storages and demand response (DR). In this paper, a risk-based stochastic optimal energy management model is developed for microgrid with renewables, energy storage and load control by time-of-use-based DR programs. Microgrid includes PV system, wind system, micro-turbine, fuel cell, electric vehicle (EV), and energy storage. Information-gap decision theory (IGDT) is employed to address the uncertainty of loads and to provide the operating strategies for the microgrid controllable energy resources. This proposed model has been solved as a mixed-integer non-linear programming (MINLP) in General Algebraic Modeling System (GAMS) software and simulation results in different conditions are studied and discussed. Three different risk management strategies have been studied such as risk-averse, risk-neutral and risk-seeker mode. The simulation results indicate that the impacts of risk-averseness or risk-seeker of the decision maker affect the system operation. For instance, the results showed the DR program's role in risk-averse and risk-taking strategies, impacting consumption and costs. The proposed model ensures the risk-averse decision-maker that if the uncertain parameter deviates within the optimum robustness region, the final cost will not exceed the critical cost. On the other hand, the risk-seeking decision-maker can reach lower final costs by accepting the risks if the uncertain parameter deviates favorably within the opportunity region. Decision-makers can manage risks by adjusting consumption. Thus, considering the cost of risk management is crucial, as it increases with robust or opportunistic approaches.
引用
收藏
页数:14
相关论文
共 33 条
  • [1] A cooperative game theoretic analysis of electric vehicles parking lot in smart grid
    Aghajani, Saemeh
    Kalantar, Mohsen
    [J]. ENERGY, 2017, 137 : 129 - 139
  • [2] Multi-objective stochastic techno-economic-environmental optimization of distribution networks with G2V and V2G systems
    Ahmadi, Seyed Ehsan
    Kazemi-Razi, S. Mahdi
    Marzband, Mousa
    Ikpehai, Augustine
    Abusorrah, Abdullah
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2023, 218
  • [3] Two-stage stochastic operation considering day-ahead and real-time scheduling of microgrids with high renewable energy sources and electric vehicles based on multi-layer energy management system
    Azarhooshang, Alireza
    Sedighizadeh, Davoud
    Sedighizadeh, Mostafa
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2021, 201
  • [4] Optimal scheduling of electric vehicles and photovoltaic systems in residential complexes under real-time pricing mechanism
    Barhagh, Sahar Seyyedeh
    Abapour, Mehdi
    Mohammadi-Ivatloo, Behnam
    [J]. JOURNAL OF CLEANER PRODUCTION, 2020, 246
  • [5] Ben-Haim Y., 2006, Academic
  • [6] Optimized sizing of photovoltaic grid-connected electric vehicle charging system using particle swarm optimization
    Bhatti, Abdul Rauf
    Salam, Zainal
    Sultana, Beenish
    Rasheed, Nadia
    Awan, Ahmed Bilal
    Sultana, Umbrin
    Younas, Muhammad
    [J]. INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 2019, 43 (01) : 500 - 522
  • [7] Robust hydrothermal scheduling under load uncertainty using information gap decision theory
    Charwand, Mansour
    Ahmadi, Abdollah
    Sharaf, Adel M.
    Gitizadeh, Mohsen
    Nezhad, Ali Esmaeel
    [J]. INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2016, 26 (03): : 464 - 485
  • [8] V2G Parking Lot With PV Rooftop for Capacity Enhancement of a Distribution System
    Chukwu, Uwakwe C.
    Mahajan, Satish M.
    [J]. IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2014, 5 (01) : 119 - 127
  • [9] Stochastic energy management of responsive plug-in electric vehicles characterizing parking lot aggregators
    Daryabari M.K.
    Keypour R.
    Golmohamadi H.
    [J]. Applied Energy, 2020, 279
  • [10] Optimal energy management of multiple electricity-hydrogen integrated charging stations
    Fang, Xiaolun
    Wang, Yubin
    Dong, Wei
    Yang, Qiang
    Sun, Siyang
    [J]. ENERGY, 2023, 262