Integrated optimization of line planning and timetabling on high-speed railway network considering cross-line operation

被引:0
|
作者
Wang, R. X. [1 ,2 ]
Nie, L. [1 ,2 ]
Fang, W. [3 ]
Ren, H. Q. [4 ]
Tan, Y. Y. [1 ,2 ]
机构
[1] Beijing Jiaotong Univ, Sch Traff & Transportat, Beijing, Peoples R China
[2] Beijing Jiaotong Univ, Frontiers Sci Ctr Smart High Speed Railway Syst, Beijing, Peoples R China
[3] China State Railway Grp Co Ltd, Beijing, Peoples R China
[4] Beijing Shanghai High Speed Railway Co Ltd, Beijing, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
Railway network; Optimization; Train line planning; Timetable scheduling; Cross-line operation; Passenger demand; Origin-destination direct service frequency; Genetic algorithm; GENETIC ALGORITHM; STOPPING PATTERNS; TRAIN; MODEL; TIME; DEMAND;
D O I
10.14743/apem2024.1.497
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With the implementation of cross-line operation in high-speed railway system, accessibility of cross-line passengers on the railway network has substantially improved. However, due to limitations of capacity, it is hard to schedule a conflict-free timetable based on a train line plan with many cross-line trains. In order to generate a feasible and optimal transportation plan, a novel methodology is introduced. The approach can simultaneously optimize both the line plans of cross-line trains and train timetable, aiming at having a trade-off between operating profit and direct service. Based on an event-activity network framework, a mixed integer programming model is established. Considering service quality would decline after optimizing line plan and train schedules, the objective of the model is set to minimize deviations from ideal schedules for main-line trains while maximize direct service frequency for cross-line passengers. To solve large-scale scenarios efficiently, an enhanced heuristic genetic algorithm is developed. Two smaller-scale cases are devised to validate the efficiency of the model and approach. Finally, the model and the algorithm are applied to a real-world scenario involving the Beijing-Shanghai High-speed Railway and its connecting lines. Also, comparative experiments, including a scenario without cross-line optimization, are conducted to evaluate the advantage of the proposed approach. The result shows the approach can help to quickly find a feasible solution and have a good balance between operating profit and passenger demand.
引用
收藏
页码:117 / 132
页数:152
相关论文
共 50 条
  • [1] Integrated optimization of train line planning and timetabling: a new method of changing train operation zone and direct-service of cross-line ODs
    Wang, Ruxin
    Nie, Lei
    Tan, Yuyan
    TRANSPORTATION LETTERS-THE INTERNATIONAL JOURNAL OF TRANSPORTATION RESEARCH, 2024,
  • [2] Daily Line Planning Optimization for High-Speed Railway Lines
    Wu, Jinfei
    Shan, Xinghua
    Sun, Jingxia
    Weng, Shengyuan
    Zhao, Shuo
    SUSTAINABILITY, 2023, 15 (04)
  • [3] Optimization of High-Speed Railway Line Planning Considering Extra-Long Distance Transportation
    Wang, Ying
    Peng, Qi-Yuan
    Liu, Ling
    Wang, Jia-Kang
    JOURNAL OF ADVANCED TRANSPORTATION, 2020, 2020
  • [4] Train timetable and stopping plan generation based on cross-line passenger flow in high-speed railway network
    Wang, Yuqiang
    MEASUREMENT & CONTROL, 2024,
  • [5] Hunting motion of high-speed emu during cross-line operation: Mechanism and countermeasures
    Yang, Zhen-huan
    Wei, Lai
    Gan, Feng
    Li, Da-di
    Dai, Huan-yun
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2024, 238 (04) : 437 - 448
  • [6] An integrated optimization approach of high-speed railway line plan to network load-balancing
    Hu, Xingzhu
    Wang, Hongwei
    Wu, Xingtang
    Zhou, Min
    Dong, Hairong
    2020 CHINESE AUTOMATION CONGRESS (CAC 2020), 2020, : 1035 - 1040
  • [7] A Line Planning Optimization Model for High-Speed Railway Network Merging Newly-Built Railway Lines
    Zhou, Wenliang
    Huang, Yujun
    Chai, Naijie
    Li, Bo
    Li, Xiang
    MATHEMATICS, 2022, 10 (17)
  • [8] Adjustment and optimization of line plan for regional high-speed railway network
    Hu, Huaibin
    Nie, Lei
    Fu, Huiling
    Gao, Ning
    Li, Hua
    Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2024, 54 (06): : 1540 - 1550
  • [9] A two-layer optimization model for high-speed railway line planning
    Li Wang
    Li-min Jia
    Yong Qin
    Jie Xu
    Wen-ting Mo
    Journal of Zhejiang University-SCIENCE A, 2011, 12 : 902 - 912
  • [10] A two-layer optimization model for high-speed railway line planning
    Wang, Li
    Jia, Li-min
    Qin, Yong
    Xu, Jie
    Mo, Wen-ting
    JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2011, 12 (12): : 902 - 912