Electric energy system planning considering chronological renewable generation variability and uncertainty

被引:12
作者
Fang, Yuchen [1 ]
Han, Jianpei [1 ]
Du, Ershun [2 ]
Jiang, Haiyang [1 ]
Fang, Yujuan [2 ]
Zhang, Ning [1 ]
Kang, Chongqing [1 ]
机构
[1] Tsinghua Univ, Dept Elect Engn, Beijing 100084, Peoples R China
[2] Tsinghua Univ, Lab Low Carbon Energy, Beijing 100084, Peoples R China
基金
中国国家自然科学基金;
关键词
Variable renewable energy; High renewable penetration; Power system planning; Operational flexibility; POWER-SYSTEM; FLEXIBILITY; TRANSMISSION; OPTIMIZATION; RESERVES;
D O I
10.1016/j.apenergy.2024.123961
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The increasing integration of renewables poses great challenges to the power system planning problem, especially, the power outputs of renewable generation show the inherent characteristics of long- and short-term chronological variability and uncertainty, which puts higher requirements on the flexibility of the planning strategy. While incorporating unit commitment (UC) constraints considering reserve capacity into planning models has been widely investigated to address renewable energy generation volatility, the re-dispatch of generation units to balance short-term forecasting errors in renewable energy is generally ignored. In this paper, we propose a novel expansion planning model that integrates operational flexibility constraints (EP-OFLX). This model aims to address both long- and short-term chronological variability and uncertainty, optimizing investment decisions for both generation and transmission facilities to achieve the desired level of renewable energy penetration. These constraints include clustered unit commitment constraints to accommodate the variability of renewables and robust re-dispatch operating constraints to handle the uncertainty of renewable generation. A case study is conducted on a modified IEEE RTS-79 system to demonstrate the effectiveness of the proposed method and verify the scalability of the EP-OFLX model. Additionally, the impacts of renewable uncertainty on flexible resource planning are analyzed.
引用
收藏
页数:13
相关论文
共 33 条
[1]  
[Anonymous], 1979, IEEE T POWER AP SYST, V98, P2047, DOI 10.1109/TPAS.1979.319398
[2]  
[Anonymous], 2013, Incorporating operational flexibility into electric generation planning: Impacts and methods for system design and policy analysis
[3]   Data-Driven Stochastic Transmission Expansion Planning [J].
Bagheri, Ali ;
Wang, Jianhui ;
Zhao, Chaoyue .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (05) :3461-3470
[4]   THE GENERALIZED UNIT COMMITMENT PROBLEM [J].
BALDICK, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (01) :465-475
[5]   Impacts of large-scale Intermittent Renewable Energy Sources on electricity systems, and how these can be modeled [J].
Brouwer, Anne Sjoerd ;
van den Broek, Machteld ;
Seebregts, Ad ;
Faaij, Andre .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2014, 33 :443-466
[6]  
Conejo A., 2006, Decomposition Techniques in Mathematical Programming
[7]   Long-term Coordination of Transmission and Storage to Integrate Wind Power [J].
Conejo, Antonio J. ;
Cheng, Yaohua ;
Zhang, Ning ;
Kang, Chongqing .
CSEE JOURNAL OF POWER AND ENERGY SYSTEMS, 2017, 3 (01) :36-43
[8]   Toward Fully Renewable Electric Energy Systems [J].
Dominguez, Ruth ;
Conejo, Antonio J. ;
Carrion, Miguel .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (01) :316-326
[9]   Managing Wind Power Uncertainty Through Strategic Reserve Purchasing [J].
Du, Ershun ;
Zhang, Ning ;
Kang, Chongqing ;
Kroposki, Benjamin ;
Huang, Han ;
Miao, Miao ;
Xia, Qing .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (04) :2547-2559
[10]  
Hirst E, 1997, Tech. Rep. ORNL/ CON -452