Automated Resource Scheduling for Construction Projects Using Genetic Algorithm

被引:0
作者
Moharram, Raghda M. [1 ]
Essawy, Yasmeen A. S. [1 ,2 ]
Hosny, Osama S. [1 ]
机构
[1] Amer Univ Cairo, Dept Construct Engn, New Cairo, Egypt
[2] Ain Shams Univ, Dept Struct Engn, Cairo, Egypt
来源
PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 1, CSCE 2022 | 2023年 / 363卷
关键词
Automated resource scheduling; Genetic algorithm; Construction projects;
D O I
10.1007/978-3-031-34593-7_32
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Site advance methods for planning and scheduling are essential for effective project management. Typically, construction managers tend to produce schedules based on two constraints: (1) Minimize Project Duration and (2) Allocate Minimum Resources. Moreover, deficits in the cash flow result in reduced profits at the end of the project and delays if financing problems arise, which results in damages (usually additional costs). Traditional scheduling tools like the Critical Path Method (CPM) and Time Constrained Project Scheduling Problem (TCPSP) do not show high efficiency in achieving the required objectives, as scheduling gets complicated. Advanced planning and scheduling methods will be used to produce a feasible schedule that meets specific objectives. This paper proposes amulti-objectivemodel, (1) minimum project duration, (2) resource availability, and (3) minimum cash flow deficit. The model is divided into two modules. The first module produces an optimized, automated schedule achieving the objective of minimum project duration. The second module applies an optimized resource constraint scheduling using user input data of the available resources to allocate the resources on each activity while maintaining the maximum number of resources on site. The model is optimized using an evolutionary algorithm, namely: Genetic Algorithm (GA).
引用
收藏
页码:513 / 522
页数:10
相关论文
共 50 条
  • [31] Quality- and profit-oriented scheduling of resource-constrained projects with flexible project structure via a genetic algorithm
    Kellenbrink, Carolin
    Helber, Stefan
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2016, 10 (05) : 574 - 595
  • [32] Integrated Planning and Scheduling of Multiple Manufacturing Projects Under Resource Constraints Using Raccoon Family Optimization Algorithm
    Rauf, Mudassar
    Guan, Zailin
    Yue, Lei
    Guo, Ziteng
    Mumtaz, Jabir
    Ullah, Saif
    IEEE ACCESS, 2020, 8 (08): : 151279 - 151295
  • [33] FUZZY GENETIC ALGORITHM MODEL FOR OPTIMIZATION OF AUTOMATED GUIDED VEHICLE SCHEDULING
    Badakhshian, Mostafa
    Sulaiman, Shamsuddin B.
    Ariffin, Mohd Khairol Anuar B.
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 1791 - 1797
  • [34] Optimum Scheduling of Generators Using Genetic Algorithm
    Joshi, G. K.
    Mathur, Sanjay
    Mathur, Sumit
    INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2008, 8 (06): : 61 - 66
  • [35] Satellite Mission Scheduling Using Genetic Algorithm
    Han, Soon-mi
    Beak, Seung-woo
    Cho, Kyuem-rae
    Lee, Dae-woo
    Kim, Hae-dong
    2008 PROCEEDINGS OF SICE ANNUAL CONFERENCE, VOLS 1-7, 2008, : 1178 - +
  • [36] CPU Task Scheduling using Genetic Algorithm
    Kaur, Abhineet
    Khehra, Baljit Singh
    2015 IEEE 3RD INTERNATIONAL CONFERENCE ON MOOCS, INNOVATION AND TECHNOLOGY IN EDUCATION (MITE), 2015, : 66 - 71
  • [37] Project scheduling using a competitive genetic algorithm
    Magalhaes-Mendes, J.
    SMO 08: PROCEEDINGS OF THE 8TH WSEAS INTERNATIONAL CONFERENCE ON SIMULATION, MODELLING AND OPTIMIZATION, 2008, : 39 - +
  • [38] A genetic algorithm for mode identity and the resource constrained project scheduling problem
    Afshar-Nadjafi, Behrouz
    Rahimi, Amir
    Karimi, Hamid
    SCIENTIA IRANICA, 2013, 20 (03) : 824 - 831
  • [39] Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm
    Kadam, Sachin U.
    Kadam, Narendra S.
    2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,
  • [40] Tailoring Genetic Algorithm for Resource Scheduling in Many-Core Processors
    Hu, Xiande
    Li, Jingming
    Cheng, Jiaxing
    PROCEEDINGS OF THE 2015 2ND INTERNATIONAL CONFERENCE ON ELECTRICAL, COMPUTER ENGINEERING AND ELECTRONICS (ICECEE 2015), 2015, 24 : 465 - 471