Automated Resource Scheduling for Construction Projects Using Genetic Algorithm

被引:0
|
作者
Moharram, Raghda M. [1 ]
Essawy, Yasmeen A. S. [1 ,2 ]
Hosny, Osama S. [1 ]
机构
[1] Amer Univ Cairo, Dept Construct Engn, New Cairo, Egypt
[2] Ain Shams Univ, Dept Struct Engn, Cairo, Egypt
来源
PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 1, CSCE 2022 | 2023年 / 363卷
关键词
Automated resource scheduling; Genetic algorithm; Construction projects;
D O I
10.1007/978-3-031-34593-7_32
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Site advance methods for planning and scheduling are essential for effective project management. Typically, construction managers tend to produce schedules based on two constraints: (1) Minimize Project Duration and (2) Allocate Minimum Resources. Moreover, deficits in the cash flow result in reduced profits at the end of the project and delays if financing problems arise, which results in damages (usually additional costs). Traditional scheduling tools like the Critical Path Method (CPM) and Time Constrained Project Scheduling Problem (TCPSP) do not show high efficiency in achieving the required objectives, as scheduling gets complicated. Advanced planning and scheduling methods will be used to produce a feasible schedule that meets specific objectives. This paper proposes amulti-objectivemodel, (1) minimum project duration, (2) resource availability, and (3) minimum cash flow deficit. The model is divided into two modules. The first module produces an optimized, automated schedule achieving the objective of minimum project duration. The second module applies an optimized resource constraint scheduling using user input data of the available resources to allocate the resources on each activity while maintaining the maximum number of resources on site. The model is optimized using an evolutionary algorithm, namely: Genetic Algorithm (GA).
引用
收藏
页码:513 / 522
页数:10
相关论文
共 50 条
  • [21] Passive Location Resource Scheduling Based on an Improved Genetic Algorithm
    Jiang, Jianjun
    Zhang, Jing
    Zhang, Lijia
    Ran, Xiaomin
    Tang, Yanqun
    SENSORS, 2018, 18 (07)
  • [22] Genetic Algorithm for Singular Resource Constrained Project Scheduling Problems
    Mahmud, Firoz
    Zaman, Forhad
    Ahrari, Ali
    Sarker, Ruhul
    Essam, Daryl
    IEEE ACCESS, 2021, 9 : 131767 - 131779
  • [23] Genetic algorithm based approach to personal worklist resource scheduling
    Deng, Tie-Qing
    Ren, Gen-Quan
    Liu, Ying-Bo
    Ruan Jian Xue Bao/Journal of Software, 2012, 23 (07): : 1702 - 1716
  • [24] COGNITIVE SAR RESOURCE SCHEDULING METHOD BASED ON GENETIC ALGORITHM
    Li, Xilai
    Shen, Mingxing
    An, Hongyang
    Wu, Junjie
    Li, Zhongyu
    Yang, Haiguang
    Yang, Jianyu
    IGARSS 2023 - 2023 IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM, 2023, : 4552 - 4555
  • [25] Value-Based Multiple Software Projects Scheduling with Genetic Algorithm
    Xiao, Junchao
    Wang, Qing
    Li, Mingshu
    Yang, Qiusong
    Xie, Lizi
    Liu, Dapeng
    TRUSTWORTHY SOFTWARE DEVELOPMENT PROCESSES, PROCEEDINGS, 2009, 5543 : 50 - 62
  • [26] A genetic algorithm for proactive project scheduling with resource transfer times
    Ma, Zhiqiang
    Zheng, Weibo
    He, Zhengwen
    Wang, Nengmin
    Hu, Xuejun
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 174
  • [27] The Multimode Resource-Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
    Garcia-Nieves, J. D.
    Ponz-Tienda, J. L.
    Salcedo-Bernal, A.
    Pellicer, E.
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2018, 33 (08) : 655 - 671
  • [28] Solving multiple processor and multiple resource constrained scheduling problems using a genetic algorithm approach
    Hussain, SA
    Chakrabarti, PP
    Sastry, VUK
    INTERNATIONAL JOURNAL OF COMPUTER MATHEMATICS, 2000, 75 (01) : 21 - 40
  • [29] Solving NPV-Based Resource Constrained Project Scheduling Problem Using Genetic Algorithm
    Phuntsho, Tshewang
    Gonsalves, Tad
    2022 10TH INTERNATIONAL CONFERENCE ON INFORMATION AND EDUCATION TECHNOLOGY (ICIET 2022), 2022, : 409 - 414
  • [30] A dual-adaptive directed genetic algorithm for construction scheduling
    Shen, Zhaozheng
    Wu, Jie
    Cao, Yilun
    JOURNAL OF BUILDING ENGINEERING, 2024, 96