共 102 条
[61]
Matsui T., 1992, Soils and foundations, V32, P59, DOI [10.3208/sandf1972.32.59, DOI 10.3208/SANDF1972.32.59]
[62]
Miller R.D., 1999, SEG Annual Meeting Expanded Technical Program with Biographies, Houston, Texas, P433
[63]
Assessing the Causes of Time Overrun in Building and Road Construction Projects: The Case of Addis Ababa City, Ethiopia
[J].
JOURNAL OF ENGINEERING,
2022, 2022
[64]
Nemcok A., 1972, ROCK MECH, V4, P71, DOI [10.1007/BF01239137, DOI 10.1007/BF01239137]
[66]
Park C. B., 1998, SEG TECHNICAL PROGRA, DOI [10.1190/1.1820161, DOI 10.1190/1.1820161]
[67]
Pasierb B., 2012, Czasopismo Techniczne, P201
[69]
Perincek D., 1983, INT S TAUR BELT
[70]
Pnek T., 2008, STUD GEOMORPHOL CARP, V42, P57