共 25 条
[1]
[Anonymous], 2014, GEM Technical Report 2014-10
[2]
[Anonymous], 2015, NMETS Strategic Implementation Plan-2015
[4]
Bard P-Y., 2021, EFEHR Technical Report 001, v1.0.0, DOI [10.12686/a1, DOI 10.12686/A1]
[5]
BORIS, 2022, Deliverable 4.1: Guidelines for cross-border risk assessment: Shared framework for single and multi-risk assessment at cross-border sites
[7]
CEN, 2019, Working draft, CEN/TC 250/SC 8 06-10-2019
[8]
Cornell C., 2000, Progress and challenges in seismic performance assessment
[10]
Dolsek M, 2020, SEISMIC STRESS TEST