External quality assurance of cost estimates in major public projects: empirical evidence on cost performance

被引:0
|
作者
Berg, Helene [1 ,2 ]
Nyhus, Ole Henning [3 ]
机构
[1] Norwegian Def Res Estab, Dept Strateg Anal, Kjeller, Norway
[2] Norwegian Univ Sci & Technol, Dept Civil & Environm Engn, Trondheim, Norway
[3] Norwegian Univ Sci & Technol, Trondheim, Norway
关键词
Cost performance; Cost overrun; Public sector; Learning effects; Project cost management; FRONT-END; FRAMEWORK; MANAGEMENT; GOVERNANCE;
D O I
10.1108/IJMPB-12-2023-0276
中图分类号
F [经济];
学科分类号
02 ;
摘要
PurposeValue creation for society from public projects requires that the overall benefits exceed the use of taxpayers' money. At the same time, cost overruns in public projects are a well-documented feature in the literature, but practical guidance on reducing the extent and magnitude of overruns is rare. In 2000, Norway introduced a governance regime that includes mandatory external quality assurance (QA) of cost estimates for major public projects. This paper compares the cost performance of public projects on each side of this QA scheme.Design/methodology/approachWe use an original dataset covering 1,704 projects from 2000 to 2021, reported first-hand from Norwegian public agencies. We apply quantitative methods in the form of descriptive statistics, regression models, and statistical testing of hypotheses to answer our research questions.FindingsThe mean cost overrun across projects in our dataset is smaller than several previous international studies have reported. We find no statistical support for different cost performances between QA and non-QA projects. Secondly, cost overruns seem to vary between different public sectors. A third finding is a small development with lower cost overruns over time for the non-QA projects, and we raise the question of whether the QA scheme has contributed to overall learning effects. The fourth finding is that cost deviations are quite independent of project size.Originality/valueThe paper offers novel insights for decision-makers and researchers on the effects of external quality assurance on cost performance in public projects.
引用
收藏
页码:455 / 475
页数:21
相关论文
共 50 条
  • [21] Cost and schedule performance in large government projects
    Welde, Morten
    Engebo, Atle
    12TH NORDIC CONFERENCE ON CONSTRUCTION ECONOMICS AND ORGANISATION, 2024, 2024, 1389
  • [22] Empirical Analysis of Cost Overrun in the Hydropower projects of Himachal Pradesh
    Devi, Sharda
    Kaur, Kanwaljit
    INTERNATIONAL JOURNAL OF EARLY CHILDHOOD SPECIAL EDUCATION, 2022, 14 (01) : 3476 - 3481
  • [23] An empirical study of employee loyalty, service quality, cost reduction and company performance
    Tomic, Ivana
    Tesic, Zdravko
    Kuzmanovic, Bogdan
    Tomic, Milos
    ECONOMIC RESEARCH-EKONOMSKA ISTRAZIVANJA, 2018, 31 (01): : 827 - 846
  • [24] Sustainability Committee, External Assurance, and ESG Performance: Empirical Evidence From Banking Industry in Emerging Economies
    Tumewang, Yunice Karina
    Almarayeh, Taha
    Alharasis, Esraa
    CORPORATE SOCIAL RESPONSIBILITY AND ENVIRONMENTAL MANAGEMENT, 2025, 32 (02) : 2728 - 2745
  • [25] Impact of sustainable supply chain management on cost performance: empirical evidence from manufacturing companies of Bangladesh
    Khanam, Zobaida
    Ghosh, Ratan
    JOURNAL OF ECONOMIC AND ADMINISTRATIVE SCIENCES, 2022,
  • [26] Factors affecting cost and time performance on highway construction projects: evidence from Thailand
    Meeampol, S.
    Ogunlana, S.
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2006, 11 (01) : 3 - +
  • [27] Dynamic modeling to reduce the cost of quality in construction projects
    Shafiei, Iman
    Eshtehardian, Ehsan
    Nasirzadeh, Farnad
    Arabi, Shiva
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (01) : 24 - 37
  • [28] A robust scheduling of projects with time, cost, and quality considerations
    Salmasnia, Ali
    Mokhtari, Hadi
    Abadi, Isa Nakhai Kamal
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 60 (5-8): : 631 - 642
  • [29] Predicting Cost Performance of Construction Projects from Projects Procurement Procedure
    Egwunatum S.I.
    Awo-Osagie A.I.
    Awodele I.A.
    Eze E.C.
    Journal of Engineering, Project, and Production Management, 2021, 11 (03) : 181 - 195
  • [30] Project Governance in State-Owned Enterprises: The Case of Major Public Projects' Governance Arrangements and Quality Assurance Schemes
    Larsen, Anne Strand Alfredsen
    Volden, Gro Holst
    Andersen, Bjorn
    ADMINISTRATIVE SCIENCES, 2021, 11 (03)