Technical potential appraisal and optimal site screening comparing AHP and fuzzy AHP methods for large-scale CSP plants: A GIS-MCDM approach in Morocco

被引:17
作者
Jbaihi, Ouafae [1 ]
Ouchani, Fatima-Zahra [1 ]
Ghennioui, Abdellatif [1 ]
Ferfra, Mohammed [2 ]
Cherkaoui, Mohamed [2 ]
机构
[1] Green Energy Pk IRESEN UM6P, Modeling & Cartog Dept, Benguerir, Morocco
[2] Mohammed V Univ Rabat, Mohammadia Sch Engineers, Elect Dept, Rabat, Morocco
关键词
GIS; MCDM; Fuzzy-AHP; AHP; Technical potential; Large-scale CSP; Energy planning; Morocco; MULTICRITERIA DECISION-MAKING; SOLAR POWER CSP; PHOTOVOLTAIC PV; SELECTION; SUITABILITY; TECHNOLOGIES; FEASIBILITY; GENERATION; HYDROGEN; FARMS;
D O I
10.1016/j.seta.2024.103877
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Given that Direct Normal Irradiation (DNI) levels are consistently elevated, Concentrating Solar Power (CSP) technology is a highly viable alternative in Morocco enabling reliable power generation. Herein, an assessment of the solar CSP technical potential was initiated, along with a comparative site suitability analysis for CSP plants using two methods: Analytic Hierarchy Process (AHP) and Fuzzy AHP. Findings brought to light Morocco 's sizeable potential reaching 21,100.32 TWh/year. Turning to distribution, most regions are appropriate, notably southern ones. Laa youne-Sakia El Hamra and Dakhla-Oued Ed-Dahab regions rank first as regards potential, reaching 5,549.72 and 5,117.31 TWh/year accordingly. Thereafter, site screening to draw comparisons between AHP and FAHP methods was established depicting discrepancies in weighting and ranking maps. Consistent with literature, screening criteria were structured by climate, orography, proximity to water resources and location. Weightings were calculated, revealing roughly the same results, with minor variations. Climate was ranked first (57.72 % for FAHP with alpha-cut, 57.34 % for FAHP with CoA, 57.70% for AHP) and location was last (5.04% for FAHP with alpha-cut, 5.07 % for FAHP with CoA, 5.00% for AHP). Ranking maps and area ratio calculations allowed variation highlight. The alpha-cut defuzzification provides closer approximation to subjectivity than the CoA method.
引用
收藏
页数:15
相关论文
共 68 条
[1]   Solar PV power plant site selection using a GIS-AHP based approach with application in Saudi Arabia [J].
Al Garni, Hassan Z. ;
Awasthi, Anjali .
APPLIED ENERGY, 2017, 206 :1225-1240
[2]   Large scale PV sites selection by combining GIS and Analytical Hierarchy Process. Case study: Eastern Morocco [J].
Alami Merrouni, Ahmed ;
Elwali Elalaoui, Fakhreddine ;
Mezrhab, Ahmed ;
Mezrhab, Abdelhamid ;
Ghennioui, Abdellatif .
RENEWABLE ENERGY, 2018, 119 :863-873
[3]   Solar power potential of Tanzania: Identifying CSP and PV hot spots through a GIS multicriteria decision making analysis [J].
Aly, Ahmed ;
Jensen, Steen Solvang ;
Pedersen, Anders Branth .
RENEWABLE ENERGY, 2017, 113 :159-175
[4]  
[Anonymous], Annuaire statistique du Maroc, version PDF| Telechargements
[5]  
[Anonymous], 2023, Summary for Policymakers: Synthesis Report., Climate Change 2023: Synthesis Report. Contribution of Working Groups I
[6]  
Aydin NY, 2009, GIS-based site selection approach for wind and solar energy systems: a case study from western turkey, DOI [10.2174/138920312803582960, DOI 10.2174/138920312803582960]
[7]  
BELLMAN RE, 1970, MANAGE SCI B-APPL, V17, pB141
[8]   FUZZY HIERARCHICAL ANALYSIS [J].
BUCKLEY, JJ .
FUZZY SETS AND SYSTEMS, 1985, 17 (03) :233-247
[9]   More solar farms or more bioenergy crops? Mapping and assessing potential land-use conflicts among renewable energy technologies in eastern Ontario, Canada [J].
Calvert, K. ;
Mabee, W. .
APPLIED GEOGRAPHY, 2015, 56 :209-221
[10]   PV site suitability analysis using GIS-based spatial fuzzy multi-criteria evaluation [J].
Charabi, Yassine ;
Gastli, Adel .
RENEWABLE ENERGY, 2011, 36 (09) :2554-2561