Bi-objective Economic Production Quantity with Partial Backordering under Uncertainty

被引:1
作者
Najafi, M. [1 ]
Ghodratnama, A. [1 ]
Pasandideh, S. H. R. [1 ]
Tavakkoli-Moghaddam, R. [2 ]
机构
[1] Kharazmi Univ, Fac Engn, Dept Ind Engn, Tehran, Iran
[2] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
来源
INTERNATIONAL JOURNAL OF ENGINEERING | 2024年 / 37卷 / 07期
关键词
Bi-objective Mathematical Model; Economic Production Quantity; Rework and Shortage; Meta-heuristics; Uncertainty; DEPENDENT DEMAND; INVENTORY MODEL; ALGORITHM; QUALITY; STOCK; EPQ;
D O I
10.5829/ije.2024.37.07a.18
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The economic production quantity (EPQ) model considers the production rate, demand rate, setup costs, holding costs, and shortage costs to find the production quantity that minimizes the sum of these costs. The goal is to balance the costs associated with production, holding inventory, and potential shortages. In this paper, two objectives include the costs of production and ordering and others in a separate objective function. In the objectives of the other costs, The cost of storage space as a supply is defined to be minimized. This study considers scrap and reworks in the EPQ model. This inventory model accounts for many items on a single machine. The production capacity is reduced, and there are shortages when only one machine exists. By determining the quantities of the products produced by the manufacturing facility, the storage space for each product, cycle time, and product scarcity, we can reduce both the overall cost and the supply cost of warehouse space due to non-linearity and the inability to solve commercial software in large dimensions, a multi-objective meta-heuristic algorithm, namely the non-dominated sorting genetic algorithm (NSGA-II), is used. The findings are further validated using the non-dominated ranking genetic algorithm (NRGA). Also, the obtained Pareto front is studied with several indicators. To perform these two algorithms at the best condition, we employed the Taguchi approach and related orthogonal arrays and performed algorithms for each array considering several factors. Also, to validate the mathematical model, we used the augmented epsilon-constraint method executed in the GAMS environment. It is clear that GAMS commercial software yields better results; however, these two algorithms are justifiable when the problem becomes bigger. Finally, by performing a sensitivity analysis for these indicators and the objective functions, the behavior of the proposed algorithms is compared and examined in detail. Also, the superior algorithm is chosen using the TOPSIS as a multi-criteria decision-making method. Numerical examples show how the presented model and the proposed algorithms may be used efficiently. A surveying literature review clarifies that the related objective functions, constraints, and solution approaches have not been investigated until now.
引用
收藏
页码:1408 / 1421
页数:14
相关论文
共 39 条
[1]  
Al Jadaan O, 2006, INT C MULT INF SCI T
[2]  
Al Jadaan O, 2009, 2009 THIRD ASIA INTERNATIONAL CONFERENCE ON MODELLING & SIMULATION, VOLS 1 AND 2, P113, DOI 10.1109/AMS.2009.38
[3]   Economic production quantity in an imperfect manufacturing process with synchronous and asynchronous flexible rework rates [J].
Al-Salamah, Muhammad .
OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
[4]   Economic production quantity (EPQ) model with partial backordering and a discount for imperfect quality batches [J].
Alves Cunha, Luiza Ribeiro ;
Santos Delfino, Ana Paula ;
dos Reis, Kamila Almeida ;
Leiras, Adriana .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (18) :6279-6293
[5]   Economic production lot sizing under imperfect quality, on-line inspection, and inspection errors: Full vs. sampling inspection [J].
Bose, Dipankar ;
Guha, Apratim .
COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 160
[6]   SF-FWA: A Self-Adaptive Fast Fireworks Algorithm for effective large-scale optimization [J].
Chen, Maiyue ;
Tan, Ying .
SWARM AND EVOLUTIONARY COMPUTATION, 2023, 80
[7]   Solution of an EPQ model for imperfect production process under game and neutrosophic fuzzy approach [J].
De, Sujit Kumar ;
Nayak, Prasun Kumar ;
Khan, Anup ;
Bhattacharya, Kousik ;
Smarandache, Florentin .
APPLIED SOFT COMPUTING, 2020, 93
[8]   A fast and elitist multiobjective genetic algorithm: NSGA-II [J].
Deb, K ;
Pratap, A ;
Agarwal, S ;
Meyarivan, T .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (02) :182-197
[9]   The Simultaneous Effect of Holding Safety Stock and Purchasing Policies on the Economic Production Quantity Model Subject to Random Machine Breakdown [J].
Deiranlou, M. ;
Dehghanian, F. ;
Pirayesh, M. A. .
INTERNATIONAL JOURNAL OF ENGINEERING, 2019, 32 (11) :1643-1655
[10]   A Diffused Memetic Optimizer for reactive berth allocation and scheduling at marine container terminals in response to disruptions [J].
Dulebenets, Maxim A. .
SWARM AND EVOLUTIONARY COMPUTATION, 2023, 80